sort by date sort by cost
Total 9 entries found , Cost: 129.0 million FCFA
Aug 25, 2022 C_BANKA SIGNE 10.0 million FCFA 15/LC/CBKA/CIPM/2022
TRAVAUX DE REHABILITATION DE LA CHEFFERIE DE BADOUIMKA
Aug 25, 2022 C_BANKA SIGNE 15.0 million FCFA 14/LC/BKA/SG/CIP/M/2022
TRAVAUX DE REHABILITATION DU CENTRE DE SANTE DE MANILA
Aug 25, 2022 C_BANKA SIGNE 8.0 million FCFA 17/LC/CBKA/CIPM/2022
TRAVAUX DE REHABILITATION DE LA CHEFFERIE DE BATCHO
Aug 25, 2022 C_BANKA SIGNE 15.0 million FCFA 16LLC/CBKA/CIPM/2022
TRAVAUX DE REHABILITATION DE LA CHEFFERIE BANFELOUK
Jun 26, 2022 C_BANKA SIGNE 18.0 million FCFA 019/LC/CBKA/CIPM/2022
REHABILITATION EP NEWTON
Jun 10, 2022 C_BANKA RECEPTIONNE 10.0 million FCFA 020/LC/CBKA/CIPM/2022
TRAVAUX REHABILITATION EP BANFEKO
Jun 10, 2022 C_BANKA SIGNE 25.0 million FCFA 03/LC/CBKA/CIPM/2022
FOURNITURE DE 100 LAMPADAIRES LUMINAIRES 150 WAC AVEC CREPUSCULAIRE
May 26, 2022 C_BANKA SIGNE 18.0 million FCFA 018/LC/CBKA/CIPM/2022
TRAVAUX DE REHABILITATION DE LA CASE COMMUNAUTAIRE DE TOUSS0
Mar 10, 2022 C_BANKA SIGNE 10.0 million FCFA 04/LC/CBKA/CIPM/2022
ACQUISITION DU MATERIEL DE GESTION DE DECHETS

Top Authorities
Top Dates