sort by date sort by cost
Total 4 entries found , Cost: 43.4 million FCFA
Aug 20, 2018 C_BAFOUSSAM_I RECEPTIONNE 9.5 million FCFA 03/LC/CABAF1/CIPM/2018
Achevement de la construction de l`EM de medjo I
May 16, 2018 C_BAFOUSSAM_I RECEPTIONNE 18.0 million FCFA 02/LC/CA.BFM1ER/CIPM/BIP 2018
Adduction d`Eau Potable à DIENGDAM-KOUH MENAM
Apr 20, 2018 C_BAFOUSSAM_I RECEPTIONNE 8.0 million FCFA 001/LC/BIP 2018/CA.BFM1ER/2018
Equipement en materiel medical au CSI de TOMDJO:
Prestataire: ETS SOFAMI MULTIPLE
Apr 10, 2018 C_BAFOUSSAM_I RECEPTIONNE 8.0 million FCFA 04/T/MINMAP/DR-OU/SMI/CRPM/2018
Construction d`un forage équipé de PMH A BAMENDZI (DJEMBISSI) LOT 1 MIFI
Prestataire: ETS YUL AND LIWO

Top Authorities
Top Dates