sort by date sort by cost
Total 5 entries found , Cost: 107.7 million FCFA
Sep 29, 2020 C_BAFANG SIGNE 15.0 million FCFA 13/LC/C/BFG/SG/CIPM-RTE/2020
Travaux de réhabilitation de la piste agricole Dohou – Keye – Banone (2 km)
Prestataire: ETS ETRAC MULTIPLE
Sep 29, 2020 C_BAFANG SIGNE 15.0 million FCFA 12/LC/BFG/SG/CIPM-RTE/2020
Travaux de réhabilitation de la piste agricole Entrée Bakotcheu - Famkeu
Prestataire: ETS ETRAC MULTIPLE
Sep 29, 2020 C_BAFANG SIGNE 20.0 million FCFA 10/LC/C/BFG/SG/CIPM-TBEC/2020
TRAVAUX DE CONSTRUCTION DU POSTE AGRICOLE DE BAKONDJI
Prestataire: ETS ENPREC MISSING
Sep 29, 2020 C_BAFANG SIGNE 27.7 million FCFA 11/LC/C/BFG/SG/CIPM-RTE/2020
Travaux de réhabilitation de la route communale Ngenack – Bavi – Batcheu (3 km)
Prestataire: ETS ETRAC MULTIPLE
Sep 29, 2020 C_BAFANG SIGNE 30.0 million FCFA 09/LC/C/BFG/SG/CIPM-BEC/2020
TRAVAUX DE CONSTRUCTION DU FOYER COMMUNAUTAIRE DE BATCHEU
Prestataire: ETS ENPREC MISSING

Top Authorities
Top Dates