sort by date sort by cost
Total 10 entries found , Cost: 132.1 million FCFA
May 17, 2023 CR_LT SIGNE 16.3 million FCFA 021/LC/CR_LT/AONO/CIPM/2023
TRAVAUX DE CONSTRUCTION DES ADDUCTIONS D’EAU. LOT 3 : EXTENSION DU RESEAU CAMWATER A JAPOMA DANS L’ARRONDISSEMENT DE DOUALA III.
May 17, 2023 CR_LT SIGNE 58.5 million FCFA 07/M/CR_LT/AONO/CIPM/2023
FOURNITURE DU MATERIEL DE BUREAU.
May 17, 2023 CR_LT SIGNE 14.7 million FCFA 027/LC/CR_LT/AONO/CIPM/2023
TRAVAUX DE RÉHABILITATION DE LA ROUTE 2ÈME ENTRÉE STADE JAPOMA HACC-CARREFOUR CONACAM QUARTIER JAPOMA LONGUEUR 1.100 KM.
May 17, 2023 CR_LT SIGNE 13.8 million FCFA 020/LC/CR_LT/AONO/CIPM/2023
TRAVAUX DE CONSTRUCTION DES ADDUCTIONS D’EAU. LOT 2 : EXTENSION DU RESEAU CAMWATER A SODIKO VILLAGE BLOC NDEMBA BEDUKE A BONABERI.
Oct 14, 2022 CR_LT RECEPTIONNE 14.3 million FCFA 15/LC/CR_LT/AONO/CIPM/2022
Travaux de réhabilitation et entretien routier fin goudron Defosso-collège de la maturité dans le Département du Wouri
2022 CR_LT ATTRIBUE
TRAVAUX DE CONSTRUCTION DES ADDUCTIONS D’EAU. LOT 3 : EXTENSION DU RESEAU CAMWATER A JAPOMA DANS L’ARRONDISSEMENT DE DOUALA III.
2022 CR_LT ATTRIBUE
TRAVAUX DE RÉHABILITATION DE LA ROUTE 2ÈME ENTRÉE STADE JAPOMA HACC-CARREFOUR CONACAM QUARTIER JAPOMA LONGUEUR 1.100 KM.
2022 CR_LT ATTRIBUE
TRAVAUX DE CONSTRUCTION DES ADDUCTIONS D’EAU. LOT 2 : EXTENSION DU RESEAU CAMWATER A SODIKO VILLAGE BLOC NDEMBA BEDUKE A BONABERI.
2022 CR_LT ATTRIBUE
FOURNITURE DU MATERIEL DE BUREAU.
Oct 14, 2022 CR_LT SIGNE 14.3 million FCFA 15/LC/CR_LT/AONO/CIPM/2022
Travaux de réhabilitation et entretien routier fin goudron Defosso-collège de la maturité dans le Département du Wouri

Top Authorities
Top Dates