sort by date sort by cost
Total 3 entries found , Cost: 735.4 million FCFA
2019 CHC INFRUCTUEUX
Remplacement des tableaux généraux basse- tension
Prestataire: MISSING
Dec 20, 2019 CHC SIGNE 49.4 million FCFA 03/M/CHC/HILTON/CIPM/2019
Maitrise d`oeuvre des travaux de remplacement des tableaux généraux basse- tension du Hilton Yaoundé
Prestataire: NEW DESIGN BUILTSHINE (N.D.B) MISSING
Nov 22, 2019 CHC SIGNE 686.0 million FCFA 0003/M/CHC/HILTON/CIPM/2020
REMPLACEMENT DES TABLEAUX GÉNÉRAUX BASSE TENSION DU HILTON YAOUNDÉ
Prestataire: PAC INTERNATIONAL CAMEROUN MULTIPLE

Top Authorities
Top Dates