Total
58
entries found
, Cost: 1.6 billion FCFA
SUPPLY OF HARDWARE MATERIALS AND SERVICING/MAINTENANCE MATERIALS FOR THE CDC - Lot 2 Supply of Servicing/Maintenance Materials for Tractors and Trailers
SUPPLY OF MATERIALS FOR CDC RUBBER FACTORIES - Lot 4 Supply of Crate Materials.
SUPPLY OF MATERIALS FOR CDC RUBBER FACTORIES - Lot 1 Supply of Hardware and Plumbing Materials
MANUAL EXCAVATION AND CONSTRUCTION OF SUSTAINABLE AGRICULTURAL NETWORK STRUCTURES IN THE CDC GROUP BANANA - Lot 3 Manaual Excavation of Tertiary Drians in Moquo 2 Farm, CDC Tiko.
CONSTRUCTION AND INSTALLATION WORKS IN THE CDC GROUP BANANA - Lot 9 Construction of a Plastic Waste Facility at Esuke Packing House, CDC Tiko
SUPPLY OF MATERIALS FOR CDC RUBBER FACTORIES - Lot 2 Supply of Formic Acid
Fourniture des équipements au groupe banane de la CDC
MANUAL EXCAVATION AND CONSTRUCTION OF SUSTAINABLE AGRICULTURAL NETWORK STRUCTURES IN THE CDC GROUP BANANA - Lot 2 Manaual Excavation of Tertiary Drians in Mafanja 2 Farm, CDC Tiko
SUPPLY OF 1No FIVE (5) TON FORKLIFT TRUCK FOR THE CDC IDENAU IDUSTRIAL UNIT.
SUPPLY OF MATERIALS, TYRES AND TUBES FOR THE CDC TECHNICAL SERVICES DEPARTMENT - Lot 3 Supply of Machine Shop Materials
MANUAL EXCAVATION AND CONSTRUCTION OF SUSTAINABLE AGRICULTURAL NETWORK STRUCTURES IN THE CDC GROUP BANANA - Lot 5 Construction of a Sustainable Agricultural Network (SAN) Structures at Esuke Packing House
Fourniture d`équipements au groupe banane de la CDC
Prevision of insurance coverage for CDC in emergency procédure LOT 3
CONSTRUCTION AND INSTALLATION OF PORTABLE WATER FILTRATION SYSTEMS IN CDC BANANA DEPARTMENT (Lot 2 - Construction/Installation of Portable Water Filtration System at Benoe)
REFILLING AND SERVICING OF FIRE EXTINGUISHERS AND SUPPLY OF PORTABLE WATER TO CDC DIKOME CAMP AND VILLAGE USING SOLAR PUMP - Lot 1 Supply of Portable Water to Dikome Camp and the Village Using Solar Pump.
SUPPLY OF EQUIPMENT FOR THE CDC GROUP BANANA - Lot 1 Supply of 20 Tons Tractor Head with Hydraulic Tipping System
Prestataire:
CAMI
MULTIPLE
SUPPLY OF MATERIALS FOR CDC RUBBER FACTORIES - Lot 3 Supply of Packaging Plastics
CONSTRUCTION AND INSTALLATION WORKS IN THE CDC GROUP BANANA - Lot 4 Construction of a Double Cell Reinforced Culvert at Benoe Estate Main Road, CDC Tiko
MANUAL EXCAVATION AND CONSTRUCTION OF SUSTAINABLE AGRICULTURAL NETWORK STRUCTURES IN THE CDC GROUP BANANA - Lot 4 Manaual Excavation of Tertiary Drians in Halfort Farm, CDC Tiko.
SUPPLY OF MATERIALS FOR CDC RUBBER FACTORIES - Lot 2 Supply of Electric Motors.
CONSTRUCTION OF MEDIUM VOLTAGE LINE IN THE CDC BANANA DEPARTMENT (Lot 2 - Across Ndongo and Benoe Estates)
Jan 29, 2018
CDC
ATTRIBUE
13.2 million
FCFA
5008/CDC/014/GBM/ITB/17
CONSTRUCTION AND INSTALLATION WORKS IN THE CDC GROUP BANANA - Lot 5 Construction of a Double Cell Reinforced Culvert at Mondoni Banana Estate, CDC Tiko
Jan 04, 2018
CDC
ATTRIBUE
21.0 million
FCFA
4989/CDC/014/GBM/ITB/17
CONSTRUCTION AND INSTALLATION WORKS IN THE CDC GROUP BANANA - Lot 8 Construction of a Plastic Waste Facility at Modeka Packing House, CDC Tiko
Jan 03, 2018
CDC
ATTRIBUE
21.0 million
FCFA
4988/CDC/014/GBM/ITB/17
CONSTRUCTION AND INSTALLATION WORKS IN THE CDC GROUP BANANA - Lot 7 Construction of a Plastic Waste Facility at Benoe Packing House, CDC Tiko
Jan 02, 2018
CDC
ATTRIBUE
14.3 million
FCFA
4985/CDC/014/GBM/ITB/17
CONSTRUCTION AND INSTALLATION WORKS IN THE CDC GROUP BANANA - Lot 2 Construction of a Canteen at Mafanja 2 Packing House, Mafanja Estate, CDC Tiko
Jan 02, 2018
CDC
ATTRIBUE
6.1 million
FCFA
4986/CDC/014/GBM/ITB/17
CONSTRUCTION AND INSTALLATION WORKS IN THE CDC GROUP BANANA - Lot 6 Installation of 12 No Water Tanks on Field Toilets Decking at Moquo Estate, CDC Tiko
Dec 28, 2017
CDC
SIGNE
15.0 million
FCFA
4982/CDC/014/GBM/ITB/17
CONSTRUCTION AND INSTALLATION WORKS IN THE CDC GROUP BANANA - Lot 3 Construction of a Canteen at Moquo Packing House, Mondoni Banana Estate, CDC Tiko
Nov 02, 2017
CDC
SIGNE
72.4 million
FCFA
000341/M/PR/CCPM-AG/2017
Supply of equipment to the group banana departement of CDC
Nov 01, 2017
CDC
SIGNE
49.6 million
FCFA
4944/CDC/011-TSD/ITB/17
SUPPLY OF MATERIALS/TYRES AND TUBES FOR THE CDC TECHNICAL SERVICES DEPARTMENT Lot 1 - Supply of Building Materials
Oct 12, 2017
CDC
SIGNE
31.8 million
FCFA
4924/CDC/011-TSD/ITB/17
SUPPLY OF MATERIALS/TYRES AND TUBES FOR THE CDC TECHNICAL SERVICES DEPARTMENT - Lot 5 Supply of Tyres and Tubes
Oct 04, 2017
CDC
SIGNE
41.7 million
FCFA
4914/CDC/011-TSD/ITB/17
SUPPLY OF MATERIALS, TYRES AND TUBES FOR THE CDC TECHNICAL SERVICES DEPARTMENT - Lot 4 Supply of Electrical Materials
Oct 04, 2017
CDC
SIGNE
47.6 million
FCFA
000283/SC/PR/MINMAP/DGMAS/DMSPI/BM/2017OF
Couvrture de deux police d`assurance de la CDC lot 1
Oct 04, 2017
CDC
SIGNE
173.5 million
FCFA
000284/SC/PR/MINMAP/DGMAS/DMSPI/BM/2017
Couvrture de deux police d`assurance de la CDC lot 2
Oct 04, 2017
CDC
SIGNE
15.7 million
FCFA
4909/CDC/011-TSD/ITB/17
SUPPLY OF MATERIALS, TYRES AND TUBES FOR THE CDC TECHNICAL SERVICES DEPARTMENT - Lot 2 Supply of Servicing/Maintenance Materials
Sep 30, 2017
CDC
SIGNE
70.5 million
FCFA
4869/CDC/014/GBM/ITB/17
SUPPLY OF HARDWARE MATERIALS AND SERVICING/MAINTENANCE MATERIALS FOR THE CDC - Lot 3 Supply of Servicing/Repairs Materials for Heavy Equipments
Sep 11, 2017
CDC
SIGNE
19.2 million
FCFA
4893/CDC/004-SD/ITB/17
SUPPLY OF STATIONERY, PRINTING JOBS, PACKING HOUSE AND PERSONNEL PROTECTIVE EQUIPMENTS FOR THE CDC (Lot 3 - Supply of Packing House Fungicide Treatment System)
Sep 04, 2017
CDC
SIGNE
104.0 million
FCFA
4874/CDC/003-GBM/ITB/17
Supply of 4No Mini Buses for the Transportation of Patients in the CDC Group Banana Department.
Prestataire:
CAMI
MULTIPLE
Aug 30, 2017
CDC
SIGNE
70.5 million
FCFA
4869/CDC/008-TSD/ITB/17
SUPPLY OF HARDWARE MATERIALS AND SERVICING/MAINTENANCE MATERIALS FOR THE CDC - Lot 1 Supply of Plant Maintenance Materials
Aug 28, 2017
CDC
SIGNE
45.9 million
FCFA
007/CDC/007-ISD/ITB/17
SUPPLY OF INKS/TONERS AND HARDWARE MATERIALS FOR THE CDC (Lot 1 - Supply of Inks and Toners)
Aug 28, 2017
CDC
SIGNE
31.9 million
FCFA
4866/CDC/005-MHSD/ITB/17
SUPPLY OF DRUGS, PARAMEDICALS, GALENICALS AND LABORATORY REAGENTS TO THE CDC (Lot 5 - Supply of Laboratory Reagents)
Aug 17, 2017
CDC
SIGNE
56.2 million
FCFA
4856/CDC/007-TSD/ITB/17
SUPPLY OF INKS/TONERS AND HARDWARE MATERIALS FOR THE CDC (Lot 2 - Supply of Hardware Materials)
Aug 09, 2017
CDC
SIGNE
10.7 million
FCFA
4853/CDC/005-MHSD/ITB/17
SUPPLY OF DRUGS, PARAMEDICALS, GALENICALS AND LABORATORY REAGENTS TO THE CDC (Lot 3 - Supply of Paramedicals)
Aug 09, 2017
CDC
SIGNE
31.3 million
FCFA
4852/CDC/014/GBM/ITB/17
CONSTRUCTION AND INSTALLATION OF PORTABLE WATER FILTRATION SYSTEMS IN CDC BANANA DEPARTMENT (Lot 1 - Construction/Installation of Portable Water Filtration System at Moquo Clinic)
Aug 02, 2017
CDC
SIGNE
29.7 million
FCFA
4844/CDC/004-SD/ITB/17
SUPPLY OF STATIONERY, PRINTING JOBS, PACKING HOUSE AND PERSONNEL PROTECTIVE EQUIPMENTS FOR THE CDC (Lot 5 - Supply of Personnel Protective Equipments)
Aug 02, 2017
CDC
SIGNE
9.3 million
FCFA
4846/CDC/004-SD/ITB/17
SUPPLY OF STATIONERY, PRINTING JOBS, PACKING HOUSE AND PERSONNEL PROTECTIVE EQUIPMENTS FOR THE CDC (Lot 2 - Supply of Printing Jobs)
Jul 25, 2017
CDC
SIGNE
25.3 million
FCFA
4843/CDC/005-MHSD/ITB/17
SUPPLY OF DRUGS, PARAMEDICALS, GALENICALS AND LABORATORY REAGENTS TO THE CDC (Lot 4 - Supply of Galenicals)
Jul 19, 2017
CDC
SIGNE
39.0 million
FCFA
4841/CDC/004-SD/ITB/17
SUPPLY OF STATIONER, PRINTING JOBS, PACKING HOUSE AND PERSONNEL PROTECTIVE EQUIPMENTS FOR THE CDC (Lot 1 - Supply of Stationery)
May 08, 2017
CDC
SIGNE
14.7 million
FCFA
4659/CDC/002-TSD/ITB/17
SUPPLY, TRANSPORTATION OF ROAD FILLING MATERIALS, REHABILITATION OF PALM OIL STORAGE TANKS AND CONSTRUCTION OF 1No 12M SPAN BRIDGE FOR THE CDC (Lot 1 - Supply of Volcanic Ash (Gravel) to Kompina Rubber Estate)
May 08, 2017
CDC
SIGNE
39.3 million
FCFA
4658/CDC/002-TSD/ITB/17
SUPPLY, TRANSPORTATION OF ROAD FILLING MATERIALS, REHABILITATION OF PALM OIL STORAGE TANKS AND CONSTRUCTION OF 1No 12M SPAN BRIDGE FOR THE CDC (Lot 4 - Construction of 1No 12M Span Reinforced Concrete Bridge in CDC Illoani Oil Palms Estate)
Mar 29, 2017
CDC
SIGNE
48.7 million
FCFA
033/M/MINMAP/CCPM-AG/2017
Fourniture des nématicids NPK à la CDC
Mar 29, 2017
CDC
SIGNE
19.5 million
FCFA
097/C/MINMAP/CCPM-AG/2017
Fourniture du TERN 750 EC à la CDC
Mar 29, 2017
CDC
SIGNE
22.1 million
FCFA
031/m/minmap/CCPM-AG/2017
Fourniture des nématicides et des produits chimiques au groupe Banane de la CDC
Mar 29, 2017
CDC
SIGNE
16.8 million
FCFA
096/C/MINMAP/CCPM-AG/2017
Fourniture du BANGUARD 42 SC à la CDC
Mar 29, 2017
CDC
SIGNE
40.1 million
FCFA
034/M/MINMAP/CCPM-AG/2017
Fourniture des nématicides et des produits chimiques à la filière Banane de la CDC
Mar 29, 2017
CDC
SIGNE
8.1 million
FCFA
046/M/MINMAP/CCPM-AG/2017
Fourniture des nmaticides et autres engrais à la CDC
Mar 29, 2017
CDC
SIGNE
23.6 million
FCFA
035/M/MINMAP/CCPM-AG/2017
Fourniture du OPAL 7,5 EC à la CDC
Mar 29, 2017
CDC
SIGNE
257.4 million
FCFA
095/C/MINMAP/CCPM-AG/2017
Fourniture du COMET PLUS 375g/l à la CDC
Mar 29, 2017
CDC
SIGNE
49.0 million
FCFA
032/M/MINMAP/CCPM-AG/2017
Fourniture de nématicides à la CDC