sort by date sort by cost
Total 1 entries found , Cost: 21.0 million FCFA
Jan 03, 2018 CDC SIGNE 21.0 million FCFA 4988/CDC/014/GBM/ITB/17
CONSTRUCTION AND INSTALLATION WORKS IN THE CDC GROUP BANANA - Lot 7 Construction of a Plastic Waste Facility at Benoe Packing House, CDC Tiko
Prestataire: PATRIMONIS SARL MULTIPLE

Top Authorities
Top Prestataires
Top Dates