sort by date sort by cost
Total 56 entries found
Jul 22, 2019 MAIRE D'EDEA I LITTORAL DEC-ATTR 7.5 million FCFA
DECISION N°012/D/CAE1ER/CABM/SM/2019 PORTANT ATTRIBUTION D’UNE LETTRE-COMMANDE
Jul 22, 2019 MAIRE D'EDEA I LITTORAL DEC-ATTR 10.0 million FCFA
DECISION N°010/D/CAE1ER/CABM/SM/2019 PORTANT ATTRIBUTION D’UNE LETTRE-COMMANDE
Jul 22, 2019 MAIRE D'EDEA I LITTORAL DEC-ATTR 20.0 million FCFA
DECISION N°011/D/CAE1ER/CABM/SM/2019 PORTANT ATTRIBUTION D’UNE LETTRE-COMMANDE
Jul 22, 2019 MAIRE D'EDEA I LITTORAL DEC-ATTR 10.0 million FCFA
DECISION N°009/D/CAE1ER/CABM/SM/2019 PORTANT ATTRIBUTION D’UNE LETTRE-COMMANDE
Jul 22, 2019 MAIRE D'EDEA I LITTORAL COMM 7.5 million FCFA
COMMUNIQUE N°012/C/CAE1ER/CABM/SM/2019 PORTANTE PUBLICATION DES RESULTATS DE L'APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N°04/AONO/CAE1er/ST/BPP/2019 DU 15/05/2019 TRAVAUX DE REHABILITATION DU CENTRE DE PROMOTION DE LA FEMME ET DE LA FAMILLE D'EDEA 1ER, DÉPARTEMENT DE LA SANAGA-MARITIME, RÉGION DU LITTORAL
Jul 22, 2019 MAIRE D'EDEA I LITTORAL COMM 20.0 million FCFA
COMMUNIQUE N°010/C/CAE1ER/CABM/SM/2019 PORTANTE PUBLICATION DES RESULTATS DE L'APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N°06/AONO/CAE1er/ST/BPP/2019 DU 15/05/2019 RELATIF AUX TRAVAUX DE CONSTRUCTION D'UN HANGAR DE STOCKAGE DDANS LA COMMUNE D'ARRONDISSEMENT D'EDEA 1, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL
Jul 22, 2019 MAIRE D'EDEA I LITTORAL COMM 10.0 million FCFA
COMMUNIQUE N°011/C/CAE1ER/CABM/SM/2019 PORTANTE PUBLICATION DES RESULTATS DE L'APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N°07/AONO/CAE1er/ST/BPP/2019 DU 15/05/2019 TRAVAUX DE CONSTRUCTION DE DEUX PONCEAUX SUR LA RIVIERE QUARTIER METEO ET QUARTIER AMOUR-BISSEKE,DANS LA COMMUNE D'ARRONDISSEMENT D'EDEA 1, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL
Jul 22, 2019 MAIRE D'EDEA I LITTORAL COMM 10.0 million FCFA
COMMUNIQUE N°009/C/CAE1ER/CABM/SM/2019 PORTANTE PUBLICATION DES RESULTATS DE L'APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N°05/AONO/CAE1ER/ST/BPP/2019 DU 15/05/2019 RELATIF AUX TRAVAUX DE REHABILITATION DES BORNES FONTAINES DANS LA COMMUNE D'ARRONDISSEMENT D'EDEA 1, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL
Jun 13, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 10.0 million FCFA
ADDITIF N°01 PORTANT MODIFICATION DE LA DATE DE DEPOT ET D’OUVERTURE DES APPELS D’OFFRES NATIONAUX OUVERTS EN PROCEDURE D’URGENCELe Maire de la Commune d’Arrondissement d’Edéa 1er, Autorité Contractante, informe les Entreprises désireuses de soumissionner aux appels d’offres ci-après, des rectificatifs suivants :- Avis d’Appel d’Offres N°07/AONO/CAE1ER/BPP/2019 du 15/06/2019 relatif aux travaux de construction de deux ponceaux sur la rivière quartier Météo et quartier Amour -Bisseke
Jun 13, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 20.0 million FCFA
ADDITIF N°01 PORTANT MODIFICATION DE LA DATE DE DEPOT ET D’OUVERTURE DES APPELS D’OFFRES NATIONAUX OUVERTS EN PROCEDURE D’URGENCELe Maire de la Commune d’Arrondissement d’Edéa 1er, Autorité Contractante, informe les Entreprises désireuses de soumissionner aux appels d’offres ci-après, des rectificatifs suivants :- Avis d’Appel d’Offres N°06/AONO/CAE1ER/BPP/2019 du 15/06/2019 relatif aux travaux de construction d’un hangar de stockage
Jun 13, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 7.5 million FCFA
ADDITIF N°01 PORTANT MODIFICATION DE LA DATE DE DEPOT ET D’OUVERTURE DES APPELS D’OFFRES NATIONAUX OUVERTS EN PROCEDURE D’URGENCE Le Maire de la Commune d’Arrondissement d’Edéa 1er, Autorité Contractante, informe les Entreprises désireuses de soumissionner aux appels d’offres ci-après, des rectificatifs suivants :- Avis d’Appel d’Offres N°04/AONO/CAE1ER/BPP/2019 du 22/03/2019 relatif aux travaux de réhabilitation du CPFF
Jun 13, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 10.0 million FCFA
ADDITIF N°01 PORTANT MODIFICATION DE LA DATE DE DEPOT ET D’OUVERTURE DES APPELS D’OFFRES NATIONAUX OUVERTS EN PROCEDURE D’URGENCE Le Maire de la Commune d’Arrondissement d’Edéa 1er, Autorité Contractante, informe les Entreprises désireuses de soumissionner aux appels d’offres ci-après, des rectificatifs suivants :- Avis d’Appel d’Offres N°05/AONO/CAE1ER/ST/BPP/2019 du 15 MAI 2019 relatif aux travaux de réhabilitation des bornes fontaines communales.
May 23, 2019 MAIRE D'EDEA I LITTORAL DEC-ATTR 25.0 million FCFA
DECISION N°007/D/CAE1ER/CABM/SM/2019 PORTANT ATTRIBUTION D’UNE LETTRE-COMMANDE
May 23, 2019 MAIRE D'EDEA I LITTORAL DEC-ATTR 7.5 million FCFA
DECISION N°006/D/CAE1ER/CABM/SM/2019 PORTANT ATTRIBUTION D’UNE LETTRE-COMMANDE
May 23, 2019 MAIRE D'EDEA I LITTORAL DEC-ATTR 16.0 million FCFA
DECISION N°008/D/CAE1ER/CABM/SM/2019 PORTANT ATTRIBUTION D’UNE LETTRE-COMMANDE
May 23, 2019 MAIRE D'EDEA I LITTORAL COMM 16.0 million FCFA
COMMUNIQUE N°008/C/CAE1ER/CABM/SM/2019 PORTANT PUBLICATION DES RESULTATS DE L’APPEL D’OFFRES N°03/AONO/CAE1ER/ST/BPP/2019 DU 20/03/2019 RELATIF AUX TRAVAUX DE CONSTRUCTION DE DEUX FORAGES EQUIPES DE POMPES A MOTRICITE HUMAINE DANS LA COMMUNE D’ARRONDISSEMENT D’EDEA 1ER, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL REPARTIS EN DEUX LOTS :- LOT 1 : MBONDANDICK- LOT 2 : MBANDA VILLAGE
May 23, 2019 MAIRE D'EDEA I LITTORAL COMM 25.0 million FCFA
COMMUNIQUE N°007/C/CAE1ER/CABM/SM/2019 PORTANT PUBLICATION DES RESULTATS DE L’APPEL D’OFFRES N°01/AONO/CAE1ER/ST/BPP/2019 DU 21/03/2019 RELATIF AUX TRAVAUX DE CONSTRUCTION D’UN MARCHE DE VIVRES A MBANDA, COMMUNE D’ARRONDISSEMENT D’EDEA 1ER, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL
May 23, 2019 MAIRE D'EDEA I LITTORAL COMM 7.5 million FCFA
COMMUNIQUE N°006/C/CAE1ER/CABM/SM/2019 PORTANT PUBLICATION DES RESULTATS DE L’APPEL D’OFFRES N°02/AONO/CAE1ER/ST/BPP/2019 DU 22/03/2019 RELATIF AUX TRAVAUX DE CONSTRUCTION D’UN FUMOIR DANS LA COMMUNE D’ARRONDISSEMENT D’EDEA 1ER, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL
May 21, 2019 MAIRE D'EDEA I LITTORAL DEC-INF 5.0 million FCFA
DECISION N°005/C/CAE1ER/CAB/SM/2019 PORTANT INFRUCTUOSITE DE L’AVIS D’APPEL D’OFFRES N°04/DC/CAE1ER/ST/BPP/2019 DU 22/03/2019 RELATIF AU TRAVAUX DE REHABILITATION DU CENTRE DE PROMOTION DE LA FEMME ET DE LA FAMILLE D’EDEA, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL
May 21, 2019 MAIRE D'EDEA I LITTORAL DEC-ATTR 9.0 million FCFA
DECISION N°001/D/CAE1ER/CABM/SM/2019 PORTANT ATTRIBUTION D’UNE LETTRE-COMMANDE
May 21, 2019 MAIRE D'EDEA I LITTORAL DEC-INF 7.5 million FCFA
DECISION N°005/C/CAE1ER/CAB/SM/2019 PORTANT INFRUCTUOSITE DE L’AVIS D’APPEL D’OFFRES N°04/DC/CAE1ER/ST/BPP/2019 DU 22/03/2019 RELATIF AU TRAVAUX DE REHABILITATION DU CENTRE DE PROMOTION DE LA FEMME ET DE LA FAMILLE D’EDEA, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL
May 21, 2019 MAIRE D'EDEA I LITTORAL DEC-ATTR 8.5 million FCFA
DECISION N°003/D/CAE1ER/CABM/SM/2019 PORTANT ATTRIBUTION D’UNE LETTRE-COMMANDE
May 21, 2019 MAIRE D'EDEA I LITTORAL DEC-ATTR 15.0 million FCFA
DECISION N°004/D/CAE1ER/CABM/SM/2019 PORTANT ATTRIBUTION D’UNE LETTRE-COMMANDE
May 21, 2019 MAIRE D'EDEA I LITTORAL COMM 9.0 million FCFA
COMMUNIQUE N°001/C/CAE1ER/CABM/SM/2019 PORTANTE PUBLICATION DES RESULTATS DE LA DEMANDE DE COTATION N°01/DC/CAE1ER/ST/BPP/2019 DU 20/03/2019 RELATIF A L’ACQUISITION DES TABLES BANCS DANS CERTAINES ECOLES DE LA COMMUNE D’ARRONDISSEMENT D’EDEA 1ER, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL
May 21, 2019 MAIRE D'EDEA I LITTORAL COMM 5.0 million FCFA
COMMUNIQUE N°002/C/CAE1ER/CABM/SM/2019 PORTANT PUBLICATION DES RESULTATS DE LA DEMANDE DE COTATION N°04/DC/CAE1ER/ST/BPP/2019 DU 22/03/2019 RELATIF A L’ACHAT DU MATERIEL AGRICOLE ET ELEVAGE DANS LA COMMUNE D’ARRONDISSEMENT D’EDEA 1ER, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL
May 21, 2019 MAIRE D'EDEA I LITTORAL COMM 15.0 million FCFA
COMMUNIQUE N°004/C/CAE1ER/CABM/SM/2019 PORTANT PUBLICATION DES RESULTATS DE LA DEMANDE DE COTATION N°03/DC/CAE1ER/ST/BPP/2019 DU 20/03/2019 RELATIF A L’EQUIPEMENT EN MOBILIER DE BUREAU DU CENTRE DE PROMOTION DE LA FEMME ET DE LA FAMILLE D’EDEA, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL
May 21, 2019 MAIRE D'EDEA I LITTORAL COMM 8.5 million FCFA
COMMUNIQUE N°003/C/CAE1ER/CABM/SM/2019 PORTANT PUBLICATION DES RESULTATS DE LA DEMANDE DE COTATION N°02/DC/CAE1ER/ST/BPP/2019 DU 21/03/2019 RELATIF A L’EQUIPEMENT EN MATERIEL INFORMATIQUE (06 ORDINATEURS COMPLETS) DU CENTRE DE PROMOTION DE LA FEMME ET DE LA FAMILLE D’EDEA, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL
May 21, 2019 MAIRE D'EDEA I LITTORAL COMM 7.5 million FCFA
COMMUNIQUE N°005/C/CAE1ER/CAB/SM/2019 PORTANT PUBLICATION DES RESULTATS DE L’APPEL D’OFFRES N°04/AONO/CAE1ER/ST/BPP/2019 DU 22/03/2018 RELATIFS AUX TRAVAUX DE REHABILITATION DU CENTRE DE PROMOTION DE LA FEMME ET DE LA FAMILLE D’EDEA, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL.
May 21, 2019 MAIRE D'EDEA I LITTORAL AO 20.0 million FCFA
AVIS D'APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N°06/AONO/CAE1 ER/ST/BPP/ 2019 DU 15/05/2019 TTRAVAUX DE CONSTRUCTION D'UN HANGAR DE STOCKAGE DANS LN COMMUNE D'ARRONDISSEMENT D'EDEA l'", DEPARTEMENT DE LA SANAGA-MARITIME, RÉGION DU LITTORALFinancement : Budget D'investissement Public (BIP)Administration Bénéficiaire : Commune d'Arrondissement d'Edéa 1
May 21, 2019 MAIRE D'EDEA I LITTORAL AO 10.0 million FCFA
AVIS D'APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N°05/AONO/CAE1 ER/ST/BPP/ 2019 DU 15/05/2019 TRAVAUX DE REHABILITATION DES BORNES FONTAINES COMMUNALES DANS CERTAINS QUARTIERS DE L'ARRONDISSEMENT D'EDÉA V, DÉPARTEMENT DE LA SANAGA-MARITIME, RÉGION DU LITTORALFinancement : Budget D'investissement Public (BIP)Administration Bénéficiaire : Commune d'Arrondissement d'Edéa 1
May 21, 2019 MAIRE D'EDEA I LITTORAL AO 10.0 million FCFA
AVIS D'APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N°007/AONO/CAE1 ER/ST/BPP/ 2019 DU 15/05/2019 TRAVAUX DE CONSTRUCTION DE DEUX PONCEAUX SUR LA RIVIERE QUARTIER METEO ET QUARTIER AMOUR-BISSEKE, COMMUNE D'ARRONDISSEMENT D'EDÉA 1", DÉPARTEMENT DE LA SANAGA-MARITIME, RÉGION DU LITTORALFinancement : Budget D'investissement Public (BIP)Administration Bénéficiaire : Commune d'Arrondissement d'Edéa 1
May 21, 2019 MAIRE D'EDEA I LITTORAL AO 7.5 million FCFA
AVIS D'APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N°04/AONO/CAE1ER/ST/BPP/ 2019 DU 22/03/2019 TRAVAUX DE REHABILITATION DU CENTRE DE PROMOTION DE LA FEMME ET DE LA FAMILLE D'EDEA 1ER, DÉPARTEMENT DE LA SANAGA-MARITIME, RÉGION DU LITTORALFinancement : Budget D'investissement Public (BIP)Administration Bénéficiaire : Commune d'Arrondissement d'Edéa 1
Apr 22, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 7.5 million FCFA
ADDITIF N °05 MODIFIANT LES CRITÈRES D'ÉLIMINATION, LES DOSSIERS NATIONAUX D'APPELS OUVERTS EN PROCÉDURE URGENTLe maire d'Edéa 1 Conseil, maître d'ouvrage, informe les entreprises qui souhaitent soumettre leurs offres après le correctif suivant: 04/AONO/CAE1ER/ST/BPP/2019 DU 22/03/2019 TRAVAUX DE REHABILITATION DU CENTRE DE PROMOTION DE LA FEMME ET DE LA FAMILLE D'EDEA 1ER
Apr 22, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 16.0 million FCFA
ADDITIF N °05 MODIFIANT LES CRITÈRES D'ÉLIMINATION, LES DOSSIERS NATIONAUX D'APPELS OUVERTS EN PROCÉDURE URGENTLe maire d'Edéa 1 Conseil, maître d'ouvrage, informe les entreprises qui souhaitent soumettre leurs offres après le correctif suivant: 03/AONO/CAE1ER/ST/BPP/2019 DU 20/03/2019 TRAVAUX DE CONSTRUCTION DE DEUX FORAGES ÉQUIPÉS DE POMPE À MOTRICITÉ HUMAINE DANS LA COMMUNE D'ARRONDISSEMENT D'EDÉA 1', DÉPARTEMENT DE LA SANAGA‑MARITIME, RÉGION DU LITTORAL REPARTIS EN DEUX LOTS :- LOT 1 : MBONDANDICK- LOT 2 : MBANDA VILLAGE
Apr 22, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 15.0 million FCFA
ADDITIF N°04 PORTANT MODIFICATION DE LA DATE DE DEPOT ET D'OUVERTURE DES APPELS D'OFFRES NATIONAUX OUVERTS EN PROCEDURE D'URGENCE ET LES AVIS DE CONSULTATION Le Maire de la Commune d'Arrondissement d'Edéa 1ER', Autorité Contractante, informe les Entreprises désireuses de soumissionner à la Demande de cotation ci-après de rectificatifs suivants : 03/DC/CAE1ER/ST/BPP/2019 DU 20/03/2019 RELATIVE A L'EQUIPEMENT EN MOBILIER DE BUREAU DU CENTRE DE PROMOTION DE LA FEMME ET DE LA FAMILLE D'EDEA 1ER, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL
Apr 22, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 9.0 million FCFA
ADDITIF N°03 PORTANT MODIFICATION DE LA DATE DE DEPOT ET D'OUVERTURE DES APPELS D'OFFRES NATIONAUX OUVERTS EN PROCEDURE D'URGENCE ET LES AVIS DE CONSULTATION Le Maire de la Commune d'Arrondissement d'Edéa 1 er, Autorité Contractante, informe les Entreprises désireuses de soumissionner à la Demand de Cotation ci-après, des rectificatifs suivants 01/DC/CAE1ER/ST/BPP/2019 DU 20/03/2019 RELATIVE A L'ACQUISITION DES TABLES BANCS DANS CERTAINES ECOLES DE L'ARRONDISSEMENT D'EDEA 1ER, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL
Apr 22, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 25.0 million FCFA
ADDITIF N° 06 PORTANT MODIFICATION DU CAUTIONEMENT PROVISOIRE DES APPELS D'OFFRES NATIONAUX OUVERTS EN PROCEDURE D'URGENCE Le Maire de la Commune d'Arrondissement d'Edéa ter, Autorité Contractante, informe les Entreprises désireuses de soumissionner aux appels d'offres ci-après, des rectificatifs suivants : Avis d'Appel d'Offres N°01 /A0NO/CAEI ER/BPP/2019 du 21Mars 2019 relatif aux travaux de construction de marché de vivres à Mbanda Avis de d'Appel d'Offres N°02/AONO/CAE1ER/ST/BPP/2019 du 22/03/2019 re!af11 aux travaux de construction d'un fumoir dons la Commune d'Arrondissement d'Edéa Avis d'Appel d'Offres N°03/A0NO/CAE 1 ER/BPP/20I9 du 20/03/2019 relatif aux travaux de construction de deux forages équipés de pompe à motricité Humaine dans la Commune d'Arrondissement d'Edéa ter repartis en deux lots : Lot 1 Mbondandick Lot 2 Mbanclid Avis d'Appel d'Offres N°04/AONO/CAE 1 ER/BPP/2019 du 22/03/2019 relatif aux travaux de réhabilitation du CPFF
Apr 22, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 15.0 million FCFA
ADDITIF N°02 PORTANT MODIFICATION DES CRITERES ELIMINATOIRES DE L'AVIS DE CONSULTATION POUR UNE DEMANDE DE COTATIONLe Maire de la Commune d'Arrondissement d'Edéa let, Autorité Contractante informe les Entreprises désireuses de soumissionner à l'Avis de Consultation ci-après, des rectificatifs suivants :Avis de consultation N°03/DC/CAE1 ER/ST/BPP/2019 du 20/03/2019 relatif à l'équipement en mobilier de bureau au Centre de Promotion de la Femme et de la Famille, Département de la Sanaga Maritime, Région du littoral.
Apr 22, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 25.0 million FCFA
ADDITIF N °05 MODIFIANT LES CRITÈRES D'ÉLIMINATION, LES DOSSIERS NATIONAUX D'APPELS OUVERTS EN PROCÉDURE URGENTLe maire d'Edéa 1 Conseil, maître d'ouvrage, informe les entreprises qui souhaitent soumettre leurs offres après le correctif suivant: 01/AONO/CAE1ER/ST/BPP/ 2019 DU 21/03/2019 POUR L'EXÉCUTION DES TRAVAUX DE CONSTRUCTION D'UN MARCHÉ DE VIVRES À MBANDA, COMMUNE D'ARRONDISSEMENT D'EDÉA 1
Apr 22, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 8.5 million FCFA
ADDITIF N°04 PORTANT MODIFICATION DE LA DATE DE DEPOT ET D'OUVERTURE DES APPELS D'OFFRES NATIONAUX OUVERTS EN PROCEDURE D'URGENCE ET LES AVIS DE CONSULTATION Le Maire de la Commune d'Arrondissement d'Edéa 1ER', Autorité Contractante, informe les Entreprises désireuses de soumissionner à la Demande de cotation ci-après de rectificatifs suivants : 002/DC/CAE1ER/ST/BPP/2019 DU 21/03/2019 EQUIPEMENT EN MATERIEL INFORMATIQUE (06 ORDINATEURS COMPLETS) DU CENTRE DE PROPMOTION DE LA FEMME ET DE LA FAMILLE D'EDEA IER, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL
Apr 22, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 5.0 million FCFA
ADDITIF N°03 PORTANT MODIFICATION DE LA DATE DE DEPOT ET D'OUVERTURE DES APPELS D'OFFRES NATIONAUX OUVERTS EN PROCEDURE D'URGENCE ET LES AVIS DE CONSULTATION Le Maire de la Commune d'Arrondissement d'Edéa 1 er, Autorité Contractante, informe les Entreprises désireuses de soumissionner à la Demande Cotation ci-après, des rectificatifs suivants 04/DC/CAE1ER/ST/BPP/2019 DU22/03/2019 RELATIVE A L'ACHAT DU MATERIEL AGRICOLE ET ELEVAGE DANS L'ARRONDISSEMENT D'EDEA 1ER
Apr 22, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 7.5 million FCFA
ADDITIF N °05 MODIFIANT LES CRITÈRES D'ÉLIMINATION, LES DOSSIERS NATIONAUX D'APPELS OUVERTS EN PROCÉDURE URGENTLe maire d'Edéa 1 Conseil, maître d'ouvrage, informe les entreprises qui souhaitent soumettre leurs offres après le correctif suivant: 02/AONO/CAE1er/ST/BPP/2019 du 22/03/2019 POUR LES TRAVAUX DE CONSTRUCTION D'UN FUMOIR DANS LA COMMUNE D'ARRONDISSEMENT D'EDEA 1
Apr 22, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 7.5 million FCFA
ADDITIF N°04 PORTANT MODIFICATION DE LA DATE DE DEPOT ET D'OUVERTURE DES APPELS D'OFFRES NATIONAUX OUVERTS EN PROCEDURE D'URGENCE ET LES AVIS DE CONSULTATION Le Maire de la Commune d'Arrondissement d'Edéa 1 er, Autorité Contractante, informe les Entreprises désireuses de soumissionner à l'appel d'offres ci-après, des rectificatifs suivants 02/AONO/CAE1er/ST/BPP/2019 du 22/03/2019 POUR LES TRAVAUX DE CONSTRUCTION D'UN FUMOIR DANS Ut COMMUNE D'ARRONDISSEMENT D'EDEA 1
Apr 22, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 25.0 million FCFA
ADDITIF N°04 PORTANT MODIFICATION DE LA DATE DE DEPOT ET D'OUVERTURE DES APPELS D'OFFRES NATIONAUX OUVERTS EN PROCEDURE D'URGENCE ET LES AVIS DE CONSULTATION Le Maire de la Commune d'Arrondissement d'Edéa 1 er, Autorité Contractante, informe les Entreprises désireuses de soumissionner à l'appel d'offres ci-après, des rectificatifs suivants 01/AONO/CAE1ER/ST/BPP/2019 DU 21/03/2019 POUR L'EXÉCUTION DES TRAVAUX DE CONSTRUCTION D'UN MARCHÉ DE VIVRES À MBANDA, COMMUNE D'ARRONDISSEMENT D'EDÉA 1
Apr 22, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 7.5 million FCFA
ADDITIF N°03 PORTANT MODIFICATION DE LA DATE DE DEPOT ET D'OUVERTURE DES APPELS D'OFFRES NATIONAUX OUVERTS EN PROCEDURE D'URGENCE ET LES AVIS DE CONSULTATION Le Maire de la Commune d'Arrondissement d'Edéa 1 er, Autorité Contractante, informe les Entreprises désireuses de soumissionner à l'appel d'offres ci-après, des rectificatifs suivants 04/AONO/CAE1ER/ST/BPP/2019 DU 22/03/2019 TRAVAUX DE REHABILITATION DU CENTRE DE PROMOTION DE LA FEMME ET DE LA FAMILLE D'EDEA 1ER, DÉPARTEMENT DE LA SANAGA-MARITIME, RÉGION DU LITTORAL
Apr 22, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 16.0 million FCFA
ADDITIF N°03 PORTANT MODIFICATION DE LA DATE DE DEPOT ET D'OUVERTURE DES APPELS D'OFFRES NATIONAUX OUVERTS EN PROCEDURE D'URGENCE ET LES AVIS DE CONSULTATION Le Maire de la Commune d'Arrondissement d'Edéa 1 er, Autorité Contractante, informe les Entreprises désireuses de soumissionner à l'appels d'offres ci-après, des rectificatifs suivants Avis d'Appel d'Offres N°03/AONO/CAE1ER/ST/BPP/2019 du 20/03/2019 relatif travaux de construction de deux forages équipés de pompe à motricité Humaine dans la Commune d'Arrondissement d'Edéa le' repartis en deux lots : Lot 1 : Mbondandick Lot 2 Mbanda
Apr 22, 2019 MAIRE D'EDEA I LITTORAL ADDITIF 7.5 million FCFA
ADDITIF N ° 01 MODIFIANT LES FRAIS D’ACQUISITION DE LA SOCIÉTÉ NATIONALE DOSSIER D'APPEL D'OFFRES OUVERT DANS UNE PROCÉDURE D'URGENCE Le maire d'Edéa 1, maître d'ouvrage, informe les entreprises qui souhaitent soumissionner à la suite du correctif suivant: Appel d'offres ouvert ouvert national N°04/AONO/CAE1ER/ST/BPP/ 2019 DU 22 mars 2019 relatif aux travaux de réhabilitation du Centre pour l'autonomisation de la femmes et de la famille d'EDEA 1ER
Mar 25, 2019 MAIRE D'EDEA I LITTORAL DC 5.0 million FCFA
AVIS DE CONSULTATION POUR UNE DEMANDE DE COTATION N°04/DC/CAE1ER/ST/BPP/2019 DU22/03/2019 RELATIVE A L'ACHAT DU MATERIEL AGRICOLE ET ELEVAGE DANS L'ARRONDISSEMENT D'EDEA 1ER, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL.
Mar 25, 2019 MAIRE D'EDEA I LITTORAL DC 9.0 million FCFA
AVIS DE CONSULTATION POUR UNE DEMANDE DE COTATION N°01/DC/CAE1ER/ST/BPP/2019 DU 20/03/2019 RELATIVE A L'ACQUISITION DES TABLES BANCS DANS CERTAINES ECOLES DE L'ARRONDISSEMENT D'EDEA 1ER, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL
Mar 25, 2019 MAIRE D'EDEA I LITTORAL AO 10.0 million FCFA
AVIS D'APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N°05/AONO/CAE1 ER/ST/BPP/ 2019 DU 21/03/2019 TRAVAUX DE REHABILITATION DES BORNES FONTAINES COMMUNALES DANS CERTAINS QUARTIERS DE L'ARRONDISSEMENT D'EDÉA V, DÉPARTEMENT DE LA SANAGA-MARITIME, RÉGION DU LITTORALFinancement : Budget D'investissement Public (BIP)Administration Bénéficiaire : Commune d'Arrondissement d'Edéa 1
Mar 25, 2019 MAIRE D'EDEA I LITTORAL DC 15.0 million FCFA
AVIS DE CONSULTATION POUR UNE DEMANDE DE COTATION N°03/DC/CAE1ER/ST/BPP/2019 DU 20/03/2019 RELATIVE A L'EQUIPEMENT EN MOBILIER DE BUREAU DU CENTRE DE PROMOTION DE LA FEMME ET DE LA FAMILLE D'EDEA 1ER, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL
Mar 25, 2019 MAIRE D'EDEA I LITTORAL DC 8.5 million FCFA
AVIS DE CONSULTATION POUR UNE DEMANDE DE COTATION N° 002/DC/CAE1ER/ST/BPP/2019 DU 21/03/2019 EQUIPEMENT EN MATERIEL INFORMATIQUE (06 ORDINATEURS COMPLETS) DU CENTRE DE PROPMOTION DE LA FEMME ET DE LA FAMILLE D'EDEA IER, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL
Mar 25, 2019 MAIRE D'EDEA I LITTORAL AO 7.5 million FCFA
AVIS D'APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N°02/AONO/CAE1er/ST/BPP/2019 du 22/03/2019 POUR LES TRAVAUX DE CONSTRUCTION D'UN FUMOIR DANS Ut COMMUNE D'ARRONDISSEMENT D'EDEA 1", DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORALFinancement : Budget D'investissement Public (BIP)Administration Bénéficiaire : Commune d'Arrondissement d'Edéa 1er
Mar 25, 2019 MAIRE D'EDEA I LITTORAL AO 25.0 million FCFA
AVIS D'APPEL. D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N°01/AONO/CAE1ER/ST/BPP/ 2019 DU 21/03/2019 POUR L'EXÉCUTION DES TRAVAUX DE CONSTRUCTION D'UN MARCHÉ DE VIVRES À MBANDA, COMMUNE D'ARRONDISSEMENT D'EDÉA 1-, DÉPARTEMENT DE LA SANAGA-MARITIME, RÉGION DU LITTORAL.FINANCEMENT : BUDGET D'INVESTISSEMENT PUBLIC (BIP) ADMINISTRATION BÉNÉFICIAIRE : COMMUNE D'ARRONDISSEMENT D'EDÉA 1ER
Mar 25, 2019 MAIRE D'EDEA I LITTORAL AO 16.0 million FCFA
AVIS D'APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N°03/AONO/CAE1ER/ST/BPP/ 2019 DU 20/03/2019 TRAVAUX DE CONSTRUCTION DE DEUX FORAGES ÉQUIPÉS DE POMPE À MOTRICITÉ HUMAINE DANS LA COMMUNE D'ARRONDISSEMENT D'EDÉA 1', DÉPARTEMENT DE LA SANAGA‑MARITIME, RÉGION DU LITTORAL REPARTIS EN DEUX LOTS :- LOT 1 : MBONDANDICK- LOT 2 : MBANDA VILLAGEFinancement : Budget D'investissement Public (BIP)Administration Bénéficiaire : Commune d'Arrondissement d'Edéa 1-
Mar 25, 2019 MAIRE D'EDEA I LITTORAL AO 7.5 million FCFA
AVIS D'APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N°04/AONO/CAE1ER/ST/BPP/ 2019 DU 22/03/2019 TRAVAUX DE REHABILITATION DU CENTRE DE PROMOTION DE LA FEMME ET DE LA FAMILLE D'EDEA 1ER, DÉPARTEMENT DE LA SANAGA-MARITIME, RÉGION DU LITTORALFinancement : Budget D'investissement Public (BIP)Administration Bénéficiaire : Commune d'Arrondissement d'Edéa 1'

Top Authorities
Top Regions
Top Dates