Dec 08, 2022 MAIRE DE BETARE-OYA EST ADDITIF 51.0 million FCFA
ADDITIF RECTIFICATIF N°01/AR/CBO/CIPM DU 06 DEC 2022RELATIF AU DOSSIER D'APPEL D'OFFRES NATIONAL OUVERT N°010/AdNO/CBO/SG/CIPM/2022 DU 07 Novembre 2022 POUR LA REALISATION DE SIX FORAGES PRODUCTIFS EQUIPES DE POMPES A MOTRICITE HUMAINES DANS SIX STRUCTURES DANS LA COMMUNE DE BETARE-OYA. DEPARTEMENT DU LOM ET DJEREM, REGION DE L'EST.
Oct 18, 2022 MAIRE DE BETARE-OYA EST ADDITIF 35.0 million FCFA
N°01/AR/CBO/CIPM DU 17/10/2022RELATIF A LA DEMANDE DE COTATION N°09/DC/CBO/SG/CIPM/2022 DU 28 Septembre 2022 POUR L'ACQUISITION D'UN VEHICULE TOUT TERRAIN DE TYPE PICK UP DOUBLE CABINE POUR LE COMPTE DE LA COMMUNE DE BETARE OYA, DEPARTEMENT DU LOM ET DJEREM, REGION DE L'EST
Jun 16, 2022 MAIRE DE BETARE-OYA EST ADDITIF 18.0 million FCFA
ADDITIF RECTIFICATIF N°01/AR/CBO/CIPM DU 14 JUIN 2022RELATIF A LA DEMANDE DE COTATION N° 08/AONO/CBO/SG/CIPM/2022 DU 24 MAI 2022 POUR EQUIPEMENT EN MACHINE A BOIS A TROIS OPERATIONS MUNIE D'UNE TABLE DE 40 CM AVEC ACCESSOIRES ET UN GROUPE ELECTROGENE A LA SAR/SM DE MARARABA DANS LA COMMUNE DE BETARE OYA, DEPARTEMENT DU LOM ET DJEREM, REGION DE L'EST.
Jun 16, 2022 MAIRE DE BETARE-OYA EST ADDITIF 100.0 million FCFA
ADDITIF RECTIFICATIF N°01/AR/CBO/CIPM/2022 DU 14 JUIN 2022 RELATIF A L'APPEL D'OFFRES NATIONAL OUVERT N°07 AONO/CBO/SG/CIPM/2022 DU 12 MAI 2022 POUR L'AMENAGEMENT DE LA VOIRIE EN TERRE ET ASSAINISSEMENT DES ITINERAIRES SUIVANTS DE LA VILLE DE BETARE-OYA. 1 – ROND POINT – ANCIENNE POSTE – PELETON - SOUS-PREFECTURE – STATION BOCOM – ROND POINT 2 – CARREFOUR OMBRE ROSE – HOPITAL DE DISTRICT DE BETARE-OYA, DEPARTEMENT DU LOM ET DJEREM, REGION DE L’EST.
Jun 16, 2022 MAIRE DE BETARE-OYA EST ADDITIF 27.0 million FCFA
ADDITIF RECTIFICATIF N°01/AR/CBO/CIPM/2022 DU 14 JUIN 2022 RELATIF AU DOSSIER D'APPEL D'OFFRES NATIONAL OUVERT N° 06/AONO/CBO/SG/CIPM/2022 DU 12 MAI 2022 POUR LES TRAVAUX DE REHABILITATION DES ROUTES COMMUNALES DANS L'ARRONDISSEMENT DE BETARE-OYA, DEPARTEMENT DU LOM ET DJEREM, REGION DE L'EST(BOULI - BIBOKO DU PK 30+00 AU PK 42+00 SOIT 12 KM)
Feb 23, 2022 MAIRE DE BETARE-OYA EST ADDITIF 42.5 million FCFA
ADDITIF RECTIFICATIF N°01 /AR/CBO/CIPM DU 22 FFV 2022 RELATIF AU DOSSIER D'APPEL D'OFFRES NATIONAL OUVERT N° 04/AONO/CBO/SG/CIPM/2022 DU 14 Février 2022 POUR LES TRAVAUX DE CONSTRUCTION DES FORAGES EQUIPES DE PMH A NDOKAYO, OUDOU-LAÏ, NGADI, MOSQUEE DE BETARE-OYA ET LYCEE DE BOULI DANS LA COMMUNE DE BETARE OYA, DEPARTEMENT DU LOM ET DJEREM, REGION DE L'EST.
Feb 08, 2022 MAIRE DE BETARE-OYA EST ADDITIF 11.9 million FCFA
ADDITIF RECTIFICATIF N°01/AR/CBO/CIPM DU 07 FEV 2022 RELATIF A LA DEMANDE DE COTATION N°02/AONO/CBO/SG/CIPM/2022 DU 17 Janvier 2022 POUR LA FOURNITUREDE 396 TABLES-BANCS DANS LES ECOLES PUBLIQUES DE LA COMMUNE DE BETARE OYA, DEPARTEMENT DU LOMET DJEREM, REGION DE L'EST.
Feb 08, 2022 MAIRE DE BETARE-OYA EST ADDITIF 249.1 million FCFA
ADDITIF RECTIFICATIF N°01/AR/CBO/CIPM DU 07 FEV 2022RELATIF A L'AVIS D'APPEL D'OFFRES NATIONAL OUVERT N° 01/AONO/CBO/SG/CIPM/2022 DU 17 Janvier 2022 POUR LES TRAVAUX D'ACHEVEMENT DE LA CONSTRUCTION DE L'HÔTEL DE VILLE DE LA COMMUNE DE BETARE OYA.