sort by date sort by cost
Total 32 entries found
Sep 19, 2024 MAIRE DE NTUI CENTRE COMM 50.0 million FCFA
COMMUNIQUE N°006/C/C-NTUI/SG/CIPM/2024 DU 19 Septembre 2024 PORTANT PUBLICATION DU RESULTAT DE L’APPEL D’OFFRES NATIONAL OUVERT N°006/AONO/C-NTUI/CIPM/2024 DU 19 AVRIL 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION DE L’AUBERGE MUNICIPALE DE NTUI, DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE
Sep 19, 2024 MAIRE DE NTUI CENTRE DEC-ATTR 50.0 million FCFA
DECISION N°006/D/C-NTUI/SG/2024 DU 19 SEPTEMBRE 2024 PORTANT PUBLICATION DU RESULTAT DE l’AVIS D’APPEL D’OFFRES NATIONAL OUVERT N° 006/AONO/C-NTUI/CIPM/2024, DU 19 AVRIL 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION DE L’AUBERGE MUNICIPALE DE NTUI (Deuxième phase) DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE.
Aug 22, 2024 MAIRE DE NTUI CENTRE DEC-ATTR 14.3 million FCFA
DECISION N°006/D/C-NTUI/SG/2024 DU 21 AOUT 2024 PORTANT PUBLICATION DU RESULTAT DE l’AVIS D’APPEL D’OFFRES NATIONAL OUVERT N° 006/AONO/C-NTUI/CIPM/2024, DU 19 AVRIL 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION DE L’AUBERGE MUNICIPALE DE NTUI (Deuxième phase) DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE.
Aug 22, 2024 MAIRE DE NTUI CENTRE COMM 50.0 million FCFA
COMMUNIQUE N°006/C/C-NTUI/SG/CIPM/2024 DU 21 AOUT 2024 PORTANT PUBLICATION DU RESULTAT DE L’APPEL D’OFFRES NATIONAL OUVERT N°006/AONO/C-NTUI/CIPM/2024 DU 19 AVRIL 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION DE L’AUBERGE MUNICIPALE DE NTUI, DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE .
Jul 08, 2024 MAIRE DE NTUI CENTRE DEC-ATTR 15.0 million FCFA
DECISION N°009/D/C-NTUI/SG/2024 DU 04 JUILLET 2024PORTANT PUBLICATION DU RESULTAT DE l’AVIS D’APPEL D’OFFRES NATIONAL OUVERTN° 008/AONO/C-NTUI/CIPM/2024, DU 27 MAI 2024EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION D’UNE CLOTURE AU CENTRE DE SANTE INTEGRE DE NTUI URBAIN, DANS LA COMMUNE DE NTUI,DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE.
Jul 08, 2024 MAIRE DE NTUI CENTRE DEC-ATTR 15.0 million FCFA
DECISION N°007/D/C-NTUI/SG/2024 DU 04 JUILLET 2024PORTANT PUBLICATION DU RESULTAT DE l’AVIS D’APPEL D’OFFRES NATIONAL OUVERT N° 007/AONO/C-NTUI/CIPM/2024, DU 19 AVRIL 2024EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE L’INSTALLATION D’UNE MINI-CENTRALE SOLAIRE AU CENTRE DE SANTE INTEGRE DE NTUI URBAIN, DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE.
Jul 08, 2024 MAIRE DE NTUI CENTRE DEC-ATTR 49.9 million FCFA
DECISION N°008/D/C-NTUI/SG/2024 DU 04 JUILLET 2024PORTANT PUBLICATION DU RESULTAT DE l’AVIS D’APPEL D’OFFRES NATIONAL OUVERTN° 002/AONO/C-NTUI/CIPM/2024, DU 19 AVRIL 2024EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE L’EXTENSION DU RESEAU ELECTRIQUE:--LOT1 : TRIPHASE ODON –HOTEL DE VILLE (première phase) ;--LOT2 : MONOPHASE DES QUARTIERS NYLON-NKOLOTTOU-ISSOUGLY-KOUSSE-MBANGA (première phase) DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE.
Jul 08, 2024 MAIRE DE NTUI CENTRE DEC-ATTR 49.8 million FCFA
DECISION N°006/D/C-NTUI/SG/2024 DU 04 JUILLET 2024PORTANT PUBLICATION DU RESULTAT DE l’AVIS D’APPEL D’OFFRES NATIONAL OUVERTN° 006/AONO/C-NTUI/CIPM/2024, DU 19 AVRIL 2024EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION DE L’AUBERGE MUNICIPALE DE NTUI (Deuxième phase) DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE.
Jul 08, 2024 MAIRE DE NTUI CENTRE COMM 15.0 million FCFA
COMMUNIQUE N°009/C/C-NTUI/SG/CIPM/2024 DU 04 JUILLET 2024 PORTANT PUBLICATION DU RESULTAT DE L’APPEL D’OFFRES NATIONAL OUVERT N°008/AONO/C-NTUI/CIPM/2024 DU 27 MAI 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION D’UNE CLOTURE AU CENTRE DE SANTE INTEGRE DE NTUI URBAIN, DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE .
Jul 08, 2024 MAIRE DE NTUI CENTRE COMM 15.0 million FCFA
COMMUNIQUE N°007/C/C-NTUI/SG/CIPM/2024 DU 04 JUILLET 2024 PORTANT PUBLICATION DU RESULTAT DE L’APPEL D’OFFRES NATIONAL OUVERT N°007/AONO/C-NTUI/CIPM/2024 DU 19 AVRIL 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE L’INSTALLATION D’UNE MINI-CENTRALE SOLAIRE AU CENTRE DE SANTE INTEGRE DE NTUI URBAIN, DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE
Jul 08, 2024 MAIRE DE NTUI CENTRE COMM 44.7 million FCFA
COMMUNIQUE N°001/C/C-NTUI/SG/CIPM/2024 DU 12 JUIN 2024 PORTANT PUBLICATION DU RESULTAT DE L’APPEL D’OFFRES NATIONAL OUVERT N°001/AONO/C-NTUI/CIPM/2024 DU 19 AVRIL 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION :-LOT1 : D’UNE MINI-ADDUCTION D’EAU POTABLE A LA GARE ROUTIERE DE NTUI :-LOT2 : DE TROIS (03) FORAGES A PMH AU CSI D’EHONDO, AU CSI DE BETAMBA ET AU CSI DE KAKE, DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE
Jul 08, 2024 MAIRE DE NTUI CENTRE COMM 50.0 million FCFA
COMMUNIQUE N°008/C/C-NTUI/SG/CIPM/2024 DU 04 JUILLET 2024 PORTANT PUBLICATION DU RESULTAT DE L’APPEL D’OFFRES NATIONAL OUVERT N°002/AONO/C-NTUI/CIPM/2024 DU 19 AVRIL 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE L’EXTENSION DU RESEAU ELECTRIQUE :--LOT1 : TRIPHASE ODON-HOTEL DE VILLE (première phase),--LOT2 : MONOPHASE DES QUARTIERS NYLON-NKOLOTTOU –ISSOUGLY-KOUSSE-MBANGA (première phase)DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE
Jul 08, 2024 MAIRE DE NTUI CENTRE COMM 50.0 million FCFA
COMMUNIQUE N°006/C/C-NTUI/SG/CIPM/2024 DU 04 JUILLET 2024 PORTANT PUBLICATION DU RESULTAT DE L’APPEL D’OFFRES NATIONAL OUVERT N°006/AONO/C-NTUI/CIPM/2024 DU 19 AVRIL 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION DE L’AUBERGE MUNICIPALE DE NTUI, DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE
Jun 13, 2024 MAIRE DE NTUI CENTRE DEC-ATTR 5.0 million FCFA
DECISION N°005/D/C-NTUI/SG/2024 DU 12 JUIN 2024 PORTANT PUBLICATION DU RESULTAT DE LA DEMANDE DE COTATION N° 001/DC/C-NTUI/CIPM/2024, DU 19 AVRIL 2024POUR L’APPUI EN APPAREILLAGES AUX POPULATIONS VULNERABLES DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE
Jun 13, 2024 MAIRE DE NTUI CENTRE DEC-ATTR 23.0 million FCFA
DECISION N°004/D/C-NTUI/SG/2024 DU 12 JUIN 2024PORTANT PUBLICATION DU RESULTAT DE l’AVIS D’APPEL D’OFFRES NATIONAL OUVERT N° 005/AONO/C-NTUI/CIPM/2024, DU 19 AVRIL 2024EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE REHABILITATION DE LA ROUTE NGUETE-----BIVOUNA (16km) DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE.
Jun 13, 2024 MAIRE DE NTUI CENTRE DEC-ATTR 30.0 million FCFA
DECISION N°003/D/C-NTUI/SG/2024 DU 12 JUIN 2024PORTANT PUBLICATION DU RESULTAT DE l’AVIS D’APPEL D’OFFRES NATIONAL OUVERT N° 004/AONO/C-NTUI/CIPM/2024, DU 19 AVRIL 2024EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE REPROFILAGE DE LA VOIRIE EN TERRE DE LA VILLE DE NTUI : RUE DES ADJOINTS, RUE N°05(CENTRE ADMINISTRATIF), RUE ALLANT DE BOLOLO A COSBIM DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE.
Jun 13, 2024 MAIRE DE NTUI CENTRE DEC-ATTR 38.0 million FCFA
DECISION N°002/D/C-NTUI/SG/2024 DU 12 JUIN 2024PORTANT PUBLICATION DU RESULTAT DE l’AVIS D’APPEL D’OFFRES NATIONAL OUVERTN° 003/AONO/C-NTUI/CIPM/2024, DU 19 AVRIL 2024EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION :-LOT1 : DE DEUX SALLES DE CLASSES A L’ECOLE PUBLIQUE DE NDOUTCHOUA-LOT2 : DE DEUX SALLES DE CLASSES A L’ECOLE PUBLIQUE DE TAMBA DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE
Jun 13, 2024 MAIRE DE NTUI CENTRE DEC-ATTR 44.8 million FCFA
DECISION N°001/D/C-NTUI/SG/2024 DU 12 JUIN 2024PORTANT PUBLICATION DU RESULTAT DE l’AVIS D’APPEL D’OFFRES NATIONAL OUVERTN° 001/AONO/C-NTUI/CIPM/2024, DU 19 AVRIL 2024EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION :-LOT1 : D’UNE MINI-ADDUCTION D’EAU POTABLE A LA GARE ROUTIERE DE NTUI -LOT2 : DE TROIS (03) FORAGES A PMH AU CSI D’EHONDO ; CSI DE BETAMBA ET AU CSI DE KAKE DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE
Jun 13, 2024 MAIRE DE NTUI CENTRE COMM
COMMUNIQUE N°005/C/C-NTUI/SG/CIPM/2024 DU 12 JUIN 2024 PORTANT PUBLICATION DU RESULTAT DE LA DEMANDE DE COTATION N°001/DC/C-NTUI/CIPM/2024 DU 19 AVRIL 2024 POUR L’APPUI EN APPAREILLAGES AUX POPULATIONS VULNERABLES DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE
Jun 13, 2024 MAIRE DE NTUI CENTRE COMM 23.0 million FCFA
COMMUNIQUE N°004/C/C-NTUI/SG/CIPM/2024 DU 12 JUIN 2024 PORTANT PUBLICATION DU RESULTAT DE L’APPEL D’OFFRES NATIONAL OUVERT N°005/AONO/C-NTUI/CIPM/2024 DU 19 AVRIL 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE REHABILITATION DE LA ROUTE NGUETE—BIVOUNA (16KM) DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE
Jun 13, 2024 MAIRE DE NTUI CENTRE COMM 30.0 million FCFA
COMMUNIQUE N°003/C/C-NTUI/SG/CIPM/2024 DU 12 JUIN 2024 PORTANT PUBLICATION DU RESULTAT DE L’APPEL D’OFFRES NATIONAL OUVERT N°004/AONO/C-NTUI/CIPM/2024 DU 19 AVRIL 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE REPROFILAGE DE LA VOIRIE EN TERRE DE LA VILLE DE NTUI : RUE DES ADJOINTS, RUE N°05 (CENTRE ADMINISTRATIF), RUE ALLANT DE BOLOLOA COSBIMDANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE
Jun 13, 2024 MAIRE DE NTUI CENTRE COMM 38.0 million FCFA
COMMUNIQUE N°002/C/C-NTUI/SG/CIPM/2024 DU 12 JUIN 2024 PORTANT PUBLICATION DU RESULTAT DE L’APPEL D’OFFRES NATIONAL OUVERT N°003/AONO/C-NTUI/CIPM/2024 DU 19 AVRIL 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION -LOT1 : DE DEUX SALLES DE CLASSES A L’ECOLE PUBLIQUE DE NDOUTCHOUA -LOT2 : DE DEUX SALLES DE CLASSES A L’ECOLE PUBLIQUE DE TAMBADANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE
Jun 13, 2024 MAIRE DE NTUI CENTRE COMM 44.7 million FCFA
COMMUNIQUE N°001/C/C-NTUI/SG/CIPM/2024 DU 12 JUIN 2024 PORTANT PUBLICATION DU RESULTAT DE L’APPEL D’OFFRES NATIONAL OUVERT N°001/AONO/C-NTUI/CIPM/2024 DU 19 AVRIL 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION -LOT1 :D’UNE MINI-ADDUCTION D’EAU POTABLE A LA GARE ROUTIERE DE NTUI -LOT2 : DE TROIS (03) FORAGES A PMH AU CSI D’EHONDO, AU CSI DE BETAMBA ET AU CSI DE KAKE, DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE
May 28, 2024 MAIRE DE NTUI CENTRE AO 15.0 million FCFA
AVIS D’APPEL D’OFFRES NATIONAL OUVERT N°008/AONO/C-NTUI/SG/CIPM/2024 DU 27 MAI 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION D’UNE CLÔTURE AU CENTRE DE SANTE INTEGRE DE NTUI, DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM - REGION DU CENTRE.
AVIS DE COTATION N° 001/DC/C-NTUI/SG/CIPM/2024 DU 19 AVRIL 2024 POURL’APPUI EN APPAREILLAGES AUX POPULATIONS VULNÉRABLES DANS LA COMMUNE DE NTUI, DANS LE DÉPARTEMENT DU MBAM ET KIM, REGION DU CENTRE.
Apr 23, 2024 MAIRE DE NTUI CENTRE AO 50.0 million FCFA
AVIS D’APPEL D’OFFRES NATIONAL OUVERT N°002/AONO/C-NTUI/SG/CIPM/2024 DU 19 Avril 2024 EN PROCÉDURE D’URGENCE POUR LES TRAVAUX D’EXTENSION DU RÉSEAU : TRIPHASÉ ENEO NTUI-VILLE A ODON –HÔTEL DE VILLE (1km800) – Lot1(première phase) ET MONOPHASÉ DES QUARTIERS NYLON–NKOLOTTOU–ISSOUGLY-KOUSSE-KELA-Lot2(première phase), DANS LA COMMUNE DE NTUI, DÉPARTEMENT DU MBAM ET KIM - RÉGION DU CENTREFINANCEMENT : Budget d’Investissement Public (BIP) MINEE – Exercice 2024
Apr 23, 2024 MAIRE DE NTUI CENTRE AO 15.0 million FCFA
AVIS D’APPEL D’OFFRES NATIONAL OUVERT N°007/AONO/C-NTUI/SG/CIPM/2024 DU 22 Avril 2024 EN PROCÉDURE D’URGENCE POUR L’INSTALLATION D’UNE MINI CENTRALE SOLAIRE AU CENTRE DE SANTE INTÈGRE (CSI DE NTUI), DANS LA COMMUNE DE NTUI, DÉPARTEMENT DU MBAM ET KIM - RÉGION DU CENTREFINANCEMENT : Budget d’Investissement Public (BIP) MINSANTE – Exercice 2024
Apr 23, 2024 MAIRE DE NTUI CENTRE AO 50.0 million FCFA
AVIS D’APPEL D’OFFRES NATIONAL OUVERT N°006/AONO/C-NTUI/CIPM/2024 DU 19 AVRIL 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION DE L’AUBERGE MUNICIPALE DE NTUI (PHASE 2), DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE Financement : BIP MINDDEVEL, Exercice 2024
Apr 23, 2024 MAIRE DE NTUI CENTRE AO 30.0 million FCFA
AVIS D’APPEL D’OFFRES NATIONAL OUVERT EN PROCEDURE D’URGENCEN°004/AONO/C-NTUI/SG/CIPM/2024 DU 19 AVRIL 2024 POUR LES TRAVAUX DE REPROFILAGE DE LA VOIRIE EN TERRE DE LA VILLE DE NTUI : RUE DES ADJOINTS, RUE N°05 (CENTRE ADMINISTRATIF), RUE ALLANT DE BOLOLO A COSBIM, DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE Financement : Ressources transférées du MINDDEVEL- Exercice 2024.Montant prévisionnel : Trente millions (30 000 000) FCFA Délai d’exécution : CENT VINGT (120) JOURS calendaires.Imputation : 58 27 100 02 641174.
Apr 23, 2024 MAIRE DE NTUI CENTRE AO 23.0 million FCFA
AVIS D’APPEL D’OFFRES NATIONAL OUVERT EN PROCEDURE D’URGENCE N°005/AONO/C-NTUI/SG/CIPM/2024 DU 19 AVRIL 2024 POUR LES TRAVAUX DE REHABILITATION DES POINTS CRITIQUES DE LA ROUTENGUETE –BIVOUNA (16km), DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM, REGION DU CENTRE. Financement : MINADER Exercice 2024.Montant prévisionnel : Vingt-trois millions (23000 000) FCFA Délai d’exécution : CENT VINGT (120) JOURS. Imputation : 58 30 186 01 641174.
Apr 23, 2024 MAIRE DE NTUI CENTRE AO 38.0 million FCFA
AVIS D’APPEL D’OFFRES NATIONAL OUVERT N°003/AONO/C-NTUI/SG/CIPM/2024 DU 19 AVRIL 2024 EN PROCEDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION D’UN BLOC DE DEUX ( 02) SALLES DE CLASSE A L’ECOLE PUBLIQUE DE NDOUTCHOUA LOT 1 ET UN BLOC DE DEUX ( 02) SALLES DE CLASSE A L’ECOLE PUBLIQUE DE TAMBA LOT 2, DANS LA COMMUNE DE NTUI, DEPARTEMENT DU MBAM ET KIM - REGION DU CENTREFINANCEMENT : Budget d’Investissement Public (BIP) MINEDUB – Exercice 2024.
Apr 23, 2024 MAIRE DE NTUI CENTRE AO 44.7 million FCFA
DOSSIER D’APPEL D’OFFRES NATIONAL OUVERT N°001/AONO/C-NTUI/SG/CIPM/2024 DU 19AVRIL 2024 EN PROCÉDURE D’URGENCE POUR LES TRAVAUX DE CONSTRUCTION D’UNE MINI-ADDUCTION POTABLE A LA GARE DE ROUTIÈRE DE NTUI (LOT 1), ET DE TROIS (03) FORAGES A PMH, AU CSI D’EHONDO, AU CSI DE BETAMBA, ET CSI DE KAKE (LOT 2), DANS LA COMMUNE DE NTUI, DÉPARTEMENT DU MBAM ET KIM - RÉGION DU CENTREFINANCEMENT : Budget d’Investissement Public (BIP) MINEE – Exercice 2024.