sort by date sort by cost
Total 48 entries found
Apr 25, 2023 MAIRE DE POUMA LITTORAL COMM 16.0 million FCFA
COMMUNIQUE N°003/C/COMMUNE DE POUMA/CIPM/SM/2023 DU 13/04/2023 PORTANT PUBLICATION DU RÉSULTAT DES ATTRIBUTIONS DES MARCHES DE L’AVIS DE COTATION N° 001/DC/C.POUMA/CIPM/SG/2023 DU 16/02/2023 POUR L’EQUIPEMENT DE CERTAINS CENTRES DE SANTE INTEGRES DE LA COMMUNE DE POUMA, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL, REPARTI-EN DEUX (02) LOTS :Lot 1 : HEGBA POUMALot 2 : TJIEDIKOI
Apr 25, 2023 MAIRE DE POUMA LITTORAL COMM 18.0 million FCFA
COMMUNIQUE N°004/C/COMMUNE DE POUMA/CIPM/SM/2023 DU 13/04/2023 PORTANT PUBLICATION DE L’INFRUCTUOSITE DE L’AVIS D’APPEL D’OFFRES NATIONAL OUVERT EN PROCEDURE D’URGENCE N° 002 /AONO/C. POUMA/CIPM/SG/SM/2023 DU 16/02/2023 POUR LES TRAVAUX DE CONSTRUCTION D’UN BLOC DE DEUX (02) SALLES DE CLASSE A L’ECOLE PUBLIQUE BILINGUE DE POUMA CENTRE, COMMUNE DE POUMA, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL.
Apr 25, 2023 MAIRE DE POUMA LITTORAL COMM 50.0 million FCFA
COMMUNIQUE N°002/C/COMMUNE DE POUMA/CIPM/SM/2023 DU 13/04/2023 PORTANT PUBLICATION DU RESULTAT DES ATTRIBUTIONS DES MARCHES DE L'AVIS D'APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N° 01/ANO/C.POUMA/CIPM/SG/SM/2023 du 16/02/2023 Pour les travaux de construction des forages équipés de PMH dans certaines localités de la Commune de Pouma, Département de la Sanaga Maritime, Région du Littoral, réparti en six (06) lots :Lot 1 : SIDONGUI IIILot 2 : SOKELLE IILot 3 : SONG MAGWETLot 4 : CSI HEGBA POUMALot 5 : SONG PAGLANLot 6 : SIDONGUI I
Apr 25, 2023 MAIRE DE POUMA LITTORAL COMM 50.0 million FCFA
COMMUNIQUE N°001/C/COMMUNE DE POUMA/CIPM/SM/2023 DU 13/04/2023 PORTANT PUBLICATION DU RESULTAT DES ATTRIBUTIONS DES MARCHES DE L'AVIS D'APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N°003/A0NO/C.POUMA/CIPM/SG/2023 DU 16/02/2023 POUR LES TRAVAUX D'ECLAIRAGE PUBLIC A PANNEAUX SOLAIRES DANS LES ARTERES DE LA VILLE DE POUMA, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL.
Jul 08, 2022 MAIRE DE POUMA LITTORAL COMM 160.0 million FCFA
COMMUNIQUE N°0012/C/COMMUNE DE POUMA/CIPM/SM/2022 DU 04/07/2022 PORTANT PUBLICATION DU RÉSULTAT DES ATTRIBUTIONS DES MARCHES DE L’AVIS D’APPEL D’OFFRE NATIONAL OUVERT EN PROCEDURE D’URGENCE N° 006 /AONO/CPOUMA/CIPM/SG/SM/2022 DU 24/05/2022 POUR LES TRAVAUX DE CONSTRUCTION DES OUVRAGES D’ART « PROGRAMME 2022 » ENTRETIEN DES ROUTES COMMUNALES DANS LA COMMUNE DE POUMA, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL EN DEUX LOTS.
Jun 07, 2022 MAIRE DE POUMA LITTORAL COMM 10.0 million FCFA
COMMUNIQUE N°010/C/COMMUNE DE POUMA/CIPM/SM/2022 DU 13/05/2022 PORTANT PUBLICATION DES RÉSULTATS DU MARCHE DE LA DEMANDE DE COTATION N°002 /DC/C.POUMA/CIPM/ SG/SM /2022 DU 13/04/2022 POUR LA FOURNITURE DES EQUIPEMENTS DE LA CASE COMMUNAUTAIRE DE NKONDJOCK DANS LA COMMUNE DE POUMA, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL.
Jun 03, 2022 MAIRE DE POUMA LITTORAL COMM 25.0 million FCFA
COMMUNIQUE N°011/C/COMMUNE DE POUMA/CIPM/SM/2022 DU 12/05/2022 PORTANT PUBLICATION DU RÉSULTAT DES MARCHES DE LA DEMANDE DE COTATION N°003/ADC/CPOUMA/CIPM /SG/SM/2022 DU 13/04/2022, POUR L’EXECUTION DES TRAVAUX DE CANTONNAGE SUR LES TRONCONS DES ROUTES REGIONALES BITUMEES T1 : POUMA-SONGBENGUE (23,6 KM) ; T2 : SAKBAYEME-HOPITAL SAGBAYEME (1,8 KM) ; T3 : BOULEVARD DES ANGES-ENTREE CARRIERE (2,2KM) ; T4 : INTER RN3-CARREFOUR SAINT ANDRE-HOPITAL SAINT ANDRE (1,6 KM) ; T5 : INTER RN3-SIBONGO (8,9 KM) DANS LA COMMUNE POUMA, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL ; PROGRAMME ANNUEL 2022.
Jun 03, 2022 MAIRE DE POUMA LITTORAL COMM 42.0 million FCFA
COMMUNIQUE N°007/C/COMMUNE DE POUMA/CIPM/SM/2022 DU 18/05/2022 PORTANT PUBLICATION DES RÉSULTATS DU MARCHE DE L’APPEL D’OFFRES NATIONAL OUVERT EN PROCEDURE D’URGENCE N°004BIS/AONO/C.POUMA/CIPM/SG/2022 DU 13/04/2022 POUR LES TRAVAUX D’ECLAIRAGE PUBLIC A PANNEAUX SOLAIRES DANS LA VILLE DE POUMA, ARRONDISSEMENT DE POUMA, DÉPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL
Jun 03, 2022 MAIRE DE POUMA LITTORAL COMM 42.0 million FCFA
COMMUNIQUE N°010/C/COMMUNE DE POUMA/CIPM/SM/2022 DU 18/05/2022 PORTANT PUBLICATION DU RÉSULTAT DES MARCHES DE L'AVIS D'APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N°0051AONO/C.POUMAICIPM/SG/2022 DU1310412022 POUR LES TRAVAUX DE REHABILITATION DE CERTAINS BATIMENTS DANS LA COMMUNE DE POUMA, DÉPARTEMENT DE LA SANAGA-MARITIME ; REGION DU LITTORAL EN DEUX (02) LOTS :LOT 1 : RÉHABILITATION DES SALLES DE CLASSE À L'ÉCOLE PUBLIQUE DE SAKBAYEME CENTRELOT 2 : RÉHABILITATION DU CSI DE HEGBA POUMA
Jun 03, 2022 MAIRE DE POUMA LITTORAL COMM 42.0 million FCFA
COMMUNIQUE N°008/C/COMMUNE DE POUMA/CIPM/SM/2022 DU 18/05/2022 PORTANT PUBLICATION DU RÉSULTAT DES MARCHES DE L’AVISD’APPEL D’OFFRES NATIONAL OUVERT EN PROCEDURE D’URGENCE N°005/AONO/C.POUMA/CIPM/SG/2022 DU13/04/2022 POUR LES TRAVAUX DE REHABILITATION DE CERTAINS BATIMENTS DANS LA COMMUNE DE POUMA, DÉPARTEMENT DE LA SANAGA-MARITIME ; REGION DU LITTORAL EN DEUX (02) LOTS :LOT 1 : RÉHABILITATION DES SALLES DE CLASSE À L’ÉCOLE PUBLIQUE DE SAKBAYEME CENTRELOT 2 : RÉHABILITATION DU CSI DE HEGBA POUMA
Jun 03, 2022 MAIRE DE POUMA LITTORAL COMM 51.0 million FCFA
COMMUNIQUE N°009/C/COMMUNE DE POUMA/CIPM/SM/2022 DU 18/05/2022 PORTANT PUBLICATION DES RESULTATS DE L’INFRUCTUOSITE DE L’AVISAPPEL D’OFFRES NATIONAL OUVERT EN PROCEDURE NORMALE N°001BIS/AONO/C.POUMA/CIPM/SG/2022 DU 13/04/2022 POUR LES TRAVAUX DE CONSTRUCTION DE CERTAINSBATIMENTS DANS LA COMMUNE DE POUMA, DÉPARTEMENT DELA SANAGA-MARITIME, REGION DU LITTORAL EN TROIS (03) LOTS :LOT 1 : CONSTRUCTION DES LOGEMENTS D’ASTREINTE À MINOMINDJOCKLOT 2 : CONSTRUCTION DES LOGEMENTS D’ASTREINTEÀ SOKELLE 1.LOT 3 : CONSTRUCTION DES LOGEMENTS D’ASTREINTE À SIBONGO.
Oct 20, 2021 MAIRE DE POUMA LITTORAL COMM 6.1 million FCFA
COMMUNIQUE N°001/C/COMMUNE DE POUMA/CIPM/SM/2021 DU 13/09/2021 PORTANT PUBLICATION DU RÉSULTAT DE LA AVIS DE CONSULTATION N°001 /DC/C-POUMA /CIPM/SG/2021 DU 13/09/2021 ELATIVE A L’ACQUISITION DES FOURNITURES PEDAGOGIQUES ET SCOLAIRES (PAQUETS MINIMA) DANS LES ECOLES PRIMAIRES DE LA COMMUNE DE POUMA)
Mar 26, 2021 MAIRE DE POUMA LITTORAL COMM 57.0 million FCFA
COMMUNIQUE N°005/C/COMMUNE DE POUMA/CIPM/SM/2021 DU 23/03/2021 PORTANT PUBLICATION DU RÉSULTAT DE L'AVIS D'APPEL D'OFFRE NATIONAL OUVERT EN PROCEDURE D'URGENCE N°005 /AONO/CPOUMA/CIPM/SM/SG/2021 DU12/02/2021 POUR LES TRAVAUX DE CONSTRUCTION DE DEUX HANGARS DE MARCHE LOT 1 ET D'UN FOYER DE JEUNES A NKONDJOCK LOT 2 DANS LA COMMUNE DE POUMA, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL.
Mar 26, 2021 MAIRE DE POUMA LITTORAL COMM 50.0 million FCFA
COMMUNIQUE N°001/C/COMMUNE DE POUMA/CIPM/SM/2021 DU 23/03/2021 PORTANT PUBLICATION DU RÉSULTAT DE L'AVIS D'APPEL D'OFFRE NATIONAL OUVERT EN PROCEDURE D'URGENCE N°001/AONO/CPOUMA/CIPM/SG/SM/2021 DU 10/02/2021 POUR LES TRAVAUX D'ELECTRIFICATION RURALE DU VILLAGE MBA'A MAPAN DANS LA COMMUNE DE POUMA, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL.
Mar 26, 2021 MAIRE DE POUMA LITTORAL COMM 26.6 million FCFA
COMMUNIQUE N°006/C/COMMUNE DE POUMA/CIPM/SM/2021 DU 23/03/2021 PORTANT PUBLICATION DU RÉSULTAT DE L'AVIS D'APPEL D'OFFRE NATIONAL OUVERT EN PROCEDURE D'URGENCE N°006/AONOICPOUMA/CIPMISM/SG/2021 DU 12/02/2021 POUR LES TRAVAUX DE REHABILITATION D'UN BLOC DE TROIS SALLES DE CLASSES A L'ECOLE PRIMAIRE DE NGWEI II LOT 1 ET D'UN BLOC DE TROIS SALLES DE CLASSES A L'ECOLE PRIMAIRE DE SIBONGO LOT 2 DANS LA COMMUNE DE POUMA, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL.
Mar 26, 2021 MAIRE DE POUMA LITTORAL COMM 50.5 million FCFA
COMMUNIQUE N°002/C/COMMUNE DE POUMA/CIPM/SM/2021 DU 23/03/2021 PORTANT PUBLICATION DU RÉSULTAT DE L'AVIS D'APPEL D'OFFRE NATIONAL OUVERT EN PROCEDURE D'URGENCE N°002 /AONO/CPOUMA/CIPM/SG/SM12021 DU 10/02/2021 POUR LES TRAVAUX DE CONSTRUCTION DES FORAGES DANS CERTAINES LOCALITES DE POUMA LOT 1(SONG WOGA), LOT 2 (PLACE DES FETES DE POUMA), LOT 3 (ECOLE PRIMAIRE DE POUMA CENTRE) ET LOT 4 (LIKOLIKOUL), LOT 5 (SONG NLENG), LOT 6 (CHEFFERIE SIKELLE II) DANS LA COMMUNE DE POUMA, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL.
Mar 26, 2021 MAIRE DE POUMA LITTORAL COMM 50.5 million FCFA
COMMUNIQUE N°003/C/COMMUNE DE POUMA/CIPM/SM/2021 DU 23/03/2021 PORTANT PUBLICATION DU RÉSULTAT DE L'AVIS D'APPEL D'OFFRE NATIONAL OUVERT EN PROCEDURE D'URGENCE N°003 /AONO/CPOUMA/CIPM/SG/2021 DU 10/02/2021 POUR LES TRAVAUX DE CONSTRUCTION DES FORAGES DANS CERTAINES LOCALITES DE POUMA LOT 1(BAMO'0), LOT 2 (ECOLE PRIMAIRE DE SAKBAYEME III), LOT 3 (NKONGA CENTRE) ET LOT 4 (IBON MO'O), LOT 5 (SANDA), LOT 6 (SONG SIMOUTH) DANS LA COMMUNE DE POUMA, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL.
Mar 26, 2021 MAIRE DE POUMA LITTORAL COMM 59.0 million FCFA
COMMUNIQUE N°004/C/COMMUNE DE POUMA/CIPM/SM/2021 DU 23/03/2021 PORTANT PUBLICATION DU RÉSULTAT DE L'AVIS D'APPEL D'OFFRE NATIONAL OUVERT EN PROCEDURE D'URGENCE N°004 /AONO/CPOUMA/CIPM/SG/SM/2021 DU 12/02/2021 POUR LES TRAVAUX D'OUVERTURE DE LA PISTE AGRICOLE SONG NDJEL•SONG TEM MAHOP BIHIAN (4KM) LOT 1 ET LA REHABILITATION DE LA ROUTE (INTER R0315) MAISON BLANCHE POUMA MONGO LOT 2; DANS L'ARRONDISSEMENT DE POUMA, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL.
Aug 07, 2020 MAIRE DE POUMA LITTORAL COMM 6.1 million FCFA
COMMUNIQUE N°011/C/COMMUNE DE POUMA/CIPM/SM/2020 DU 15/007/2020 PORTANT PUBLICATION DU RÉSULTAT DE L'AVIS DE CONSULTATION N°001 /DC/C-POUMA /CIPM/SG/2020 DU 19/05/2020 RELATIVE A L'ACQUISITION DES FOURNITURES PEDAGOGIQUES ET SCOLAIRES (PAQUETS MINIMA) DANS LES ECOLES PRIMAIRES I)E LA COMMUNE I)E POUMA)
May 27, 2020 MAIRE DE POUMA LITTORAL COMM 27.7 million FCFA
COMMUNIQUE N°005/C/COMMUNE DE POUMA/CIPM/SM/2020 DU 30/03/2020 PORTANT PUBLICATION DU RÉSULTAT DE L’AVIS D’APPEL D’OFFRE NATIONAL OUVERT EN PROCEDURE D’URGENCE N°005/AONO/CPOUMA/CIPM/SG/2020 DU 09/04/2020 POUR LES TRAVAUX DE REHABILITATION DU TRONÇON (RN3 – NDOGNEN) ; DANS L’ARRONDISSEMENT DE POUMA, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL.
Apr 09, 2020 MAIRE DE POUMA LITTORAL COMM 16.5 million FCFA
COMMUNIQUE N°003/C/COMMUNE DE POUMA/CIPM/SM/2020 DU 30/03/2020 PORTANT PUBLICATION DU RÉSULTAT DE L’AVIS D’APPEL D’OFFRE NATIONAL OUVERT EN PROCEDURE D’URGENCEN°004/AONO/CPOUMA/CIPM/SG/2020 DU 03/02/2020POUR LES TRAVAUX DE CONSTRUCTION D’UN BLOC DE DEUX SALLES DE CLASSE A SOKELLE 1 LOT UNIQUE DANS LA COMMUNE DE POUMA, DEPARTEMENT DE LA SANAGAMARITIME, REGION DU LITTORAL.
Apr 09, 2020 MAIRE DE POUMA LITTORAL COMM 20.0 million FCFA
COMMUNIQUE N°002/C/COMMUNE DE POUMA/CIPM/SM/2020 DU 30/03/2020 PORTANT PUBLICATION DU RÉSULTAT DE L’AVIS D’APPEL D’OFFRE NATIONAL OUVERT EN PROCEDURE D’URGENCE N°002/AONO/CPOUMA/CIPM/SG/2020 DU 03/02/2020 POUR LES TRAVAUX DE CONSTRUCTION D’UN PONCEAU SUR LA RIVIERE NSERI (NGOMPEM) LOT UNIQUE DANS LA COMMUNE DE POUMA, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL.
Apr 09, 2020 MAIRE DE POUMA LITTORAL COMM 87.7 million FCFA
COMMUNIQUE N°001/C/COMMUNE DE POUMA/CIPM/SM/2020 DU 30/03/2020 PORTANT PUBLICATION DU RÉSULTAT DE L’AVIS D’APPEL D’OFFRE NATIONAL OUVERT EN PROCEDURE D’URGENCE N°001/AONO/CPOUMA/CIPM/SG/2020 DU 03/02/2010 POUR LES TRAVAUX DE REHABILITATION DE CERTAINES ROUTES LOT 1 (LIMITE NGWEI II – STADE SONG WOGA ; LOT 2 (ENTREE CARRIERE (RN3) SOKELLE II) ; LOT 3 (RN3 – NDOGNEN) ; DANS L’ARRONDISSEMENT DE POUMA, DEPARTEMENT DE LA SANAGAMARITIME, REGION DU LITTORAL.
Jul 16, 2019 MAIRE DE POUMA LITTORAL COMM 41.5 million FCFA
COMMUNIQUE N°08/SG/SM/CIPM/COMMUNE DE POUMA Du 25/06/2019 Portant publication des résultats de L'AVIS DE DEMANDE DE COTATION N°01/ADC/COMMUNE DE POUMA/CIPM /SM/20I9 DU 03 /05/2019 POUR L'EXECUTION DES TRAVAUX DE CANTONNAGE SUR CERTAINS TRONCONS DE ROUTE DU RESEAU ROUTIER NATIONAL BITUME DANS LA COMMUNE DE POUMA, PROGRAMME ANNUEL 2019 dans la Commune De Pouma Département De La Sanaga-Maritime Région Du Littoral.
Jul 02, 2019 MAIRE DE POUMA LITTORAL COMM 10.0 million FCFA
COMMUNIQUE N°07/SG/SM/CIPM/COMMUNE DE POUMA Du 25/06/2019 Portant publication des résultats de L’APPEL D’OFFRES NATIONAL OUVERT PROCEDURE D’URGENCE N°00 5/AONO/COMMUNE DE POUMA/CIPM/SM/2019 DU 03/05/2019 POUR LES TRAVAUX D’EXECUTION DE L’OPERATION VILLE VERTE (VIABILISATION DE LA ZONE MARECAGEUSE FACE MARCHE DE POUMA) COMMUNE DE POUMA, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL.
May 28, 2019 MAIRE DE POUMA LITTORAL COMM 40.0 million FCFA
COMMUNIQUE N° 006 /SG/SM/CIPM/COMMUNE DE POUMA Du 29/03/2019 PORTANT PUBLICATION DES RESULTATS DE L"APPEL D'OFFRES NATIONAL OUVERT EN PROCEDURE D'URGENCE N° 003 /AONO/CPOUMA/CIPM/SG/2019DU 29/03/2019 CONSTRUCTION DE LA CASE COMMUNAUTAIRE A SONG SIMOUTH PHASE 1 ET PHASE 2 DANS LA COMMUNE DE POUMA, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL.
Nov 02, 2018 MAIRE DE POUMA LITTORAL COMM 41.5 million FCFA
ADDITIF N°02/DC /CP/SG/SPM/2018 DEMANDE DE COTATION N° 02/DC/CP/SM/CIPM/SG/2018 DU 11/10 /2018 POUR L’EXECUTION DU CANTONNAGE SUR LES ROUTES REVÊTUES DU DEPARTEMENT DE LA SANAGA MARITIMECOMMUNE DE POUMA
May 31, 2018 MAIRE DE POUMA LITTORAL COMM 20.0 million FCFA
COMMUNIQUE N° 06/SG/SM/CIPM/COMMUNE DE POUMA Du 22/05/2018 Portant publication des résultats de l'Appel d'Offres National Ouvert en Procédure d'Urgence N°008/AONO/COMMUNE DE POUMA/CIPM/SM/2018 du 18 Avril 2018 pour l'agrandissement de la piste agricole D55 BAM0.0 SONG MAGWET (5km) dans l'arrondissement de Pouma, département de la Sanaga- Maritime Région du Littoral.
May 31, 2018 MAIRE DE POUMA LITTORAL COMM 20.0 million FCFA
COMMUNIQUE N°05/SG/SM/CIPM/COMMUNE DE POUMA Du 22/05/2018 Portant publication des résultats de l'Appel d'Offres National Ouvert en Procédure d'Urgence N°006/AONO/COMMUNE DE POUMA/ CIPM/SM/2018 du 17 Avril 2018 pour les travaux d'électrification rurale dans la localité de BEON NDOKOMA dans l'arrondissement de Pauma, département de la Sanaga-Maritime Région du Littoral.
May 31, 2018 MAIRE DE POUMA LITTORAL COMM 10.0 million FCFA
COMMUNIQUE N°07/SG/SM/CIPM/COMMUNE DE POUMA Du 22/05/2018 Portant publication des résultats de l'Appel d'Offres National Ouvert en Procédure d'Urgence N°007/A0NO/COMMUNE DE POUMAI CIPMISM/2018 du 17 Avril 2018 pour les travaux d'exécution de l'opération ville verte (aménagement d'un jardin public) dans l'Arrondissement de Pouma, département de la Sanaga- Maritime Région du Littoral.
DECISION MUNICIPALE N°12/DM/CP/SG/18 PORTANT SUSPENSION DE LA PROCEDURE DE LANCEMENT DE L'APPEL D'OFFRES NATIONAL N°009/AONO/CPOUMA/CIPM/SG/18 DU 18/04/2018 POUR LES TRAVAUX DE REHABILITATION DE LA PISTE AGRICOLE LOGNANGA-PAROISSE- NKANLA (12 KILOMETRES).
COMMUNIQUE N°03/SG/SM/CIPM/COMMUNE DE POUMA Du 18/04/2018 Portant publication des résultats de l'Appel d'Offres National Ouvert en Procédure d'Urgence N°002/AONO/COMMUNE DE POUMA/ CIPM/SM/2018 du 06 Mars 2018 pour les travaux d'aménagement de la boucle ITAT MBAI —LOGMBON avec construction d'un ouvrage au PK4 +200 dans la Commune de Pouma, département de la Sanaga- Maritime Région du Littoral
COMMUNIQUE N°02/SG/SM/CIPM/COMMUNE DE POUMA Du 18/04/2018 Portant publication des résultats de l’Appel d’Offres National Ouvert en Procédure d’Urgence N°002/AONO/COMMUNE DE POUMA/ CIPM/SM/2018 du 06 Mars 2018 pour la réhabilitation des voies en terre à Pouma centre dans la Commune de Pouma Département de la Sanaga- Maritime Région du Littoral
Apr 26, 2018 MAIRE DE POUMA LITTORAL COMM 11.0 million FCFA
COMMUNIQUE N°01/SG/SM/CIPM/COMMUNE DE POUMA Du 18/04/2018 Portant publication des résultats de l’Appel d’Offres National Ouvert en Procédure d’Urgence N°004/AONO/COMMUNE DE POUMA/ CIPM/SM/2018 du 06 Mars 2018 pour la maitrise d’œuvre du suivi et du contrôle des travaux d’aménagement de la boucle ITAT MBAI –LOGMBON avec construction d’un ouvrage au PK4 +200 dans la Commune de Pouma, département de la Sanaga- Maritime Région du Littoral.
Apr 26, 2018 MAIRE DE POUMA LITTORAL COMM 25.0 million FCFA
COMMUNIQUE N°04/SG/SM/CIPM/COMMUNE DE POUMA Du 18/04/2018 Portant publication des résultats de l'Appel d'Offres National Ouvert en Procédure d'Urgence N°005/AONO/COMMUNE DE POUMA/ CIPM/SM/2018 du 09 Mars 2018 pour les travaux de construction d'un centre zootechnique vétérinaire (modèle1) dans la Commune de Pouma, département de la Sanaga- Maritime Région du Littoral.
ADDITIF N°01 /CP/SG/SPM/2018 AVIS D’APPEL D’OFFRES NATIONAL OUVERT N°002/AONO/COMMUNE DE POUMA/CIPM/SM/SG/2018 EN PROCEDURE D’URGENCE POUR LA REHABILITATION DES VOIES EN TERRE DANS LA VILLE DE POUMA Financement : BIP 2018 – CREDITS TRANSFERES A LA COMMUNE DE POUMA. BIEN VOULOIR TELECHARGER LA PIECE JOINTE
May 05, 2017 MAIRE DE POUMA LITTORAL COMM 112.4 million FCFA
COMMUNIQUE N°08/SG/SM/CIPM/COMMUNE DE POUMA Du 24/04/2017 Portant publication des résultats de l'Appel d'Offres National Ouvert en Procédure d'Urgence N°003/AONO/COMMUNE DE POUMA/ CIPM/SM/2017 du 14 Mars 2017 pour l'électrification rurale de certaines localités dans la Commune de Pouma Département de la Sanaga- Maritime Région du Littoral (lot 01 deux églises SOKELLE II ; lot 02 NGOMPEM ; lot 03 SIBONGO et lot 04 SONG NGUENA).
COMMUNIQUE N°010/SG/SM/CIPM/COMMUNE DE POUMA Du 24/04/2017 Portant publication des résultats de l'Appel d'Offres National Ouvert en Procédure d'Urgence N°002/AONO/COMMUNE DE POUMA/ CIPM/SM/2017 du 13 Mars 2017 pour l'exécution des travaux de réhabilitation du hangar de marché à SACKBAYEME Ill dans la Commune de Pouma département de la Sanaga- Maritime Région du Littoral.
May 05, 2017 MAIRE DE POUMA LITTORAL COMM 112.4 million FCFA
COMMUNIQUE N°09/SG/SM/CIPM/COMMUNE DE POUMA Du 24/04/2017 Portant publication des résultats de l'Appel d'Offres National Ouvert en Procédure d'Urgence N°003/AONO/COMMUNE DE POUMA/ CIPM/SM/2017 du 14 Mars 2017 pour l'électrification rurale de certaines localités dans la Commune de Pouma Département de la Sanaga- Maritime Région du Littoral (lot 01 deux églises SOKELLE II ; lot 02 NGOMPEM ; lot 03 SIBONGO et lot 04 SONG NGUENA).
May 05, 2017 MAIRE DE POUMA LITTORAL COMM 112.4 million FCFA
COMMUNIQUE N°07/SG/SM/CIPM/COMMUNE DE POUMA Du 24/04/2017 Portant publication des résultats de l'Appel d'Offres National Ouvert en Procédure d'Urgence N°003/AONO/COMMUNE DE POUMA/ CIPM/SM/2017 du 14 Mars 2017 pour l'électrification rurale de certaines localités dans la Commune de Pouma Département de la Sanaga- Maritime Région du Littoral (lot 01 deux églises SOKELLE II ; lot 02 NGOMPEM ; lot 03 SIBONGO et lot 04 SONG NGUENA).
COMMUNIQUE N°06/SG/SM/CIPM/COMMUNE DE POUMA Du 24/04/2017 Portant publication des résultats de l'Appel d'Offres National Ouvert en Procédure d'Urgence N°001/A0NO/COMMUNE DE POUMA/ CIPM/SM/2017 du 13 Mars 2017 pour l'exécution des travaux de construction de six forages certaines localités de la commune de Pouma, Repartis en cinq lots (06) : : LOT 1 Ngwei 2 (long suna), LOT 2 Pouma (Pongo), LOT 3 Ndokoma( Ndognen), LOT 4 Makop log bako'o (long nguimouth), LOT 5 Sokelle Sikelle, LOT 6 Makak Ndokoma (Bion).
May 05, 2017 MAIRE DE POUMA LITTORAL COMM 112.4 million FCFA
COMMUNIQUE N° 05/SG/SM/CIPM/COMMUNE DE POUMA Du 24/04/2017 Portant publication des résultats de l'Appel d'Offres National Ouvert en Procédure d'Urgence N°003/AONO/COMMUNE DE POUMA/ CIPM/SM/2017 du 14 Mars 2017 pour l'équipement du Centre d'Education et d'Action Communautaire de BIBOUMHA dans la Commune de Pauma département de la Sanaga- Maritime Région du Littoral.
COMMUNIQUE 04/SG/SM/CIPM/COMMUNE DE POUMA Du 24/04/2017 Portant publication des résultats de l'Appel d'Offres National Ouvert en Procédure d'Urgence N°001/AONO/COMMUNE DE POUMA/ CIPM/SM/2017 du 13 Mars 2017 pour l'exécution des travaux de construction de six forages dans certaines localités de la commune de Pouma, Repartis en cinq lots (06) : : LOT 1 Ngwei 2 (long suna), LOT 2 Pouma (Pongo), LOT 3 Ndokoma( Ndognen), LOT 4 Makop log bako'o (song nguimouth), LOT 5 Sokelle Sikelle , LOT 6 Makak Ndokoma (Bion) .
Apr 24, 2017 MAIRE DE POUMA LITTORAL COMM 77.8 million FCFA
COMMUNIQUE N°015/C/PR/MINMAP/DR-LT/SMI du 17/04/17 Portant publication du résultat de l’Appel d’Offres National Ouvert en procédure d’urgence N°013/AONO/DRMAP-LT/SMI/CRPM-LT/2017 du 10 mars 2017, pour les travaux d’électrification rurale des localités : Ndjock Nkong, Sidongui (Song Tang, Song Nkeng), dans la Commune de Pouma, Département de la Sanaga Maritime, Région du Littoral. Maître d’Ouvrage : Délégué Départemental de l’Eau et de l’Energie de la Sanaga Maritime Financement: Budget d’Investissement Public, Exercices 2017-2018
Apr 05, 2017 MAIRE DE POUMA LITTORAL COMM 5.0 million FCFA
ADDITIF N°01 /CP/SG/SPM/2017 A L'AVIS DE CONSULTATION POUR UNE DEMANDE DE COTATION: CONSULTATION N°001 /DC/COMMUNE DE POUMA/CIPM/SM/2017 DU 14/03/2017 POUR L'EQUIPEMENT DU CENTRE D'EDUCATION ET D'ACTIONS COMMUNAUTAIRES, DANS L'ARRONDISSEMENT DE POUMA DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL.
Apr 05, 2017 MAIRE DE POUMA LITTORAL COMM 112.4 million FCFA
ADDITIF N°01 /CP/SG/SPM/2017 A L'APPEL D'OFFRE NATIONAL OUVERT EN PROCEDURE N°003/AONO/COMMUNE POUMA/CIPM/SM/2017 DU 14/03/2017 POUR LES TRAVAUX D'ELECTRIFICATION RURALE DE CERTAINES LOCALITES DE LA COMMUNE DE POUMA REPARTIS EN QUATRE (04) LOTS : LOT 1 (2 EGLISES SOKELLE 2), LOT 2(NGOMPEM), LOT 3 (EXTENSION DE LA BASSE TENSION DANS PLUSIEURS QUARTIERS DE SIBONGO), LOT 4 (TRANSFORMATION DU RESEAU MT EN MONO MT/BT SONG NGUENA
ADDITIF N°01 /CP/SG/SPM/2017 A L'APPEL D'OFFRE NATIONAL OUVERT EN PROCEDURE N°002/AONO/COMMUNE POUMA/CIPM/SM/2017 DU 13/03/2017 POUR LES TRAVAUX DE REHABILITATION D'UN HANGAR DU MARCHE DE SACKBAYEME 3, DEPARTEMENT DE LA SANAGA-MARITIME, REGION DU LITTORAL.
ADDITIF N°01 /CP/SG/SPM/2017 A L'APPEL D'OFFRE NATIONAL OUVERT EN PROCEDURE D'URGENCE N° 001 /AONO/COMMUNE PO UMA/ CIPM/SM/ 2017 DU 13 /03/2017 POUR LES TRAVAUX DE CONSTRUCTION DE SIX FORAGES POSITIFS EQUIPES DANS CERTAINES LOCALITES DE LA COMMUNE DE POUMA : LOT 1 NGWEI 2 (LONG SUNA), LOT 2 PONGO, LOT 3 MAKAK NDOKOMA(NDOGNEN), LOT 4 MAKOP LOG BAKO'O (SONG NGUIMOUTH), LOT 5 SOKELLE SIKELLE, LOT 6 MAKAK NDOKOMA (BION), DANS L'ARRONDISSEMENT DE POUMA, DEPARTEMENT DE LA SANAGA MARITIME, REGION DU LITTORAL.

Top Authorities
Top Regions